Egypt Zones accountACCOUNT

Senior Process Engineer / Senior Project Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
12 years Engineering - Petroleum
10 years Project Designer
10 years Senior Project Engineer

Career Objective

Facilities Engineer Gas Process Assets manager Engineering Management

Professional Experience

ARGENTINE PASSPORT 10.189.991


• 2010, currently - Independent Consulting
Consulting engineer and technical support for Oil & Gas activities at Oritupano Leona, Casma Anaco and Bare oilfields.

• 2008 – 2009 Technical Consulting at Petrolera Kaki
Project Manager of EPC Project NGL Plant at Kaki Oilfield,Venezuela.

• 2006 – 2007 Campos Maduros y Carabobo I Projects, Technical Coordinator at PETROBRAS ENERGIA VENEZUELA
Drawing up development plans for such fields, supervising and coordinating the team work activities (Geology, Reservoir, Facilities and Planning). Prepare and submit reports internally and to PDVSA. To analyze and optimize investment and operational costs of the fields for various development scenarios.Participate in tecnology selection for production and treatment heavy oil of Carabobo Oilfield, Orinoco Belt.

2003 – 2005. Operational Process Leader,PETROBRAS ENERGIA VENEZUELA.
Nation wide coordinator of Operational Resources Optimization Program, ORO) implementing quality programs in all operation stages. Study, modeling and definition of contracts strategies for O&M oilfield services and gas compression at country level


Facilities Management, Caracas, 01\07\00 al 30/12/02 Project Manager of Injection Produce Water Plants for all operational areas in Venezuela. Technical specs for different models of bids: EPC, EPMC, BOT, BOO for plants construction between 30.000 until 500.000 BWPD.
Mata, 01\01\98 al 30\06\00 In charge of Operation Management. Production Plans fulfillment and operational cost control.
• 1996 – 1997 Facilities Project leader, Neuquén, Argentina, Naviera Perez Companc Co.
Secondary Recovery Project Manager for water injection system with capacity 100.000 BWPD,
1991 – 1996 Facilities Engineer at Engineering Department Puesto Hernandez Oilfield, Argentina,
- Gas Engineering:
Reinjection Gas Project Leader
Acid Gas Treatment and Compression Project, supervising and starting up a Permeation Membranes Plant.
Participation in EPC Treatment Oil Plant Project, 90.000 BOPD.
Project Leader of Optimization and enlarging Fresh Water Injection Plant (190.000 BWPD)
Project Leader EPC Produced Water Injection Plant (250.000 BWPD)
• 1986 – 1991 Chief of Facilities Project and control Division YPF, Neuquén, Argentina.

• 1979 – 1985 Production Engineer YPF, Neuquén, Argentina.





Eductation

EDUCATION
• Degree: CHEMICAL TECHNICIAN
Polytechnic Institute of Rosario, annex Rosario National University
• College degree: CHEMICAL ENGINEER
Rosario College of Technological National University
• Post Graduate Studies: PETROLEUM ENGINEER, Exploitation
Petroleum Institute of National University of Buenos Aires

Additional Information

SKILLS
o Lead multidisciplinary teams, decision making capabilities and work under pressure.
o Solid knowledge of processes of production, treatment, handling and transfer petroleum, gas and produced water.
o Manage and execute facilities projects and economic technical studies for development oil and gas fields.
o Experienced on Maintenance and Operation of Oil and Gas field, including analyzing operational costs, strategies for hiring and planning and assest management.
o Experienced on training and academic activities both college and university

PAPER WORKS AND WORKSHOPS

 “Applying Membranes Technology in Puesto Hernandez Oilfield “- Oil and Gas Production Workshop - IAP Buenos Aires, September 1993, Argentina.

 “Applying news technologies in Produced Water Injection Plants” –
INGEPET 2002, IV International Seminar, First Award of Poster Section, November 2002, Lima, Peru.

 “Assets and Quality Management: Implementation in Oilfields Operation in Venezuela” –
East Petroleum Congress, November 2006, Lechería – State Anzoátegui, Venezuela



 DOWNTIME WORKSHOP
Leading and coordinating a workshop to obtain improvement at exploitation efficiency of oilfield for decrease downtime with participation of different discipline participants of Operational Areas and Production Engineering of Argentina, Peru, Ecuador and Venezuela. December 2005, Caracas, Venezuela.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
700-Petroleum and Geology 400-Project Management Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.