Egypt Zones accountACCOUNT

Operation geologist, waterflooding enginner


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 15 years
Relocation: Yes - Internationally

Industry Experience
15 years Scientist II

Career Objective

learn and grow in the oil industry

Professional Experience

Production geologist & production engineer in Loma Negra Field (Neuquina Basin, Argentina)
Well production optimization (Mechanical & ESP pumps). Work over proposals. Field operations coordinator (pullings, WO, routine field data gathering campaigns). Centrilift ESPs behavior monitoring.
Injection surveillance.
Engineering and geological support to production operations. Chevron Since 06/01/2007 to 08/01/2009
Production geologist & reservoir engineer in Trapial Field (Neuquina Basin, Argentina)
Water flooding and reservoir monitoring. Reservoir management. Pattern balancing. Work over proposals. Wire line logging operations supervisor (open hole, Baker Atlas & Schlumberger). Log evaluation. Mud logging supervisor. New wells proposal. Work like geological support with reservoir and production management.

Chevron Since 07/17/2002 to 31/05/2007
Mud Logger Formation evaluation. Formation pressure
evaluation. Trailer Captain.
Field responsibilities included samples descriptions, monitoring and interpreting drilling data gas chromatograms and other gas chemical parameters and well pressure analysis. Preparation of well final reports to the clients.
Synergic Petroleum Technologies S.A. From 11/01/1996 To 07/17/2002
Mud Logger Formation Evaluation. Baker Hughes INTEQ From 09/13/1995 To 03/01/1996


Eductation

Well control Instruction (WellCAPl) - IADC
Escuela Arg. De control de surgencias
“Reservoir Management”
Petroskills Houston – Texas 03/2007

“Seismic Geological Interpretation” by Guillermo Rossi
Bs As Chevron Office
07/2006

Chevron Reservoir Management Forum 2006. The Woodlands, Houston, Texas.
May 2006
“Water control process” by Steve Chung Trapial field 10/2005
“El Trapial Field Reservoir Work shop” by Takur Ganesh Chevron – Bs. As. 8/2005
“Reservoir logging applications” by Alberto Khatchikian IAPG, Bs.As
4/2005
“Water Flooding” by Willam Cobb ChevronTexaco – Bs. As. 11/2004
“Reservoir Engineering” by Juan Rosbaco IAPG (Oil & Gas Argentinean Institute) – Bs. As. 09/2004
Field Trip: Geology and Petroleum systems of the Neuquen Basin and Central Andes of Argentina Neuquen Province, Argentina

H2S: Nature of H2S. Emergency procedures. Handling of respiration equipment.

Defensive driving

Advances Logging Procedures

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 700-Petroleum and Geology Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
1 2 3 4 5
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.