Project Construction Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
My objective is to increase my career level and to gain more experience in oil and gas construction industry and to complete project without having any cost impact.
Professional Experience
Main offshore/onshore projects successfully completed:
02/2010 to 03/2010 (Deputy Offshore Manger Position): Installation of 4 MEG riser, spools and stabilization mattresses at SPD8 platform in Iran, South Pars Gas field for StaoilHydro on DP2 DSV with 18 men saturation diving system.
06/2009 to 07/2009 (Deputy Offshore Manger Position): Installation of 32 dropout spool, closing spool after metrology, 4 MEG spools and stabilization mattresses at SPD8 platform in Iran, South Pars Gas field for StaoilHydro on DP2 DSV with 18 men saturation diving system.
02/2008 to 06/2008: Pipelay and riser installation project in Lake Maracaibo field, Venezuela for PDVSA.
Pipe lay spread engineering and fabrication in Houston, Texas
Mobilization of Pipe Lay DP vessel at Gulf Copper ship yard in Galveston, Texas.
04/2007 to 05/2007: Metrology of proposed Riser/J-tube locations for 18 platforms and 14 existing spools in the Maydan Mahzam and BulHanine oil fields in Qatar.
11/2006 to 12/2006: Power and ICCP cables installation from platform MRJN 155 to MRJN TP-5 and MRJN 176/185 to MRJN TP-4 in the Marjan field in Saudi Arabia for Mc Dermott / Aramco.
11/2006: 24inch subsea pipeline flange inspection and repair in the Safanyia field in Saudi Arabia for Mc Dermott / Aramco.
10/2006 to 11/2006: J-tubes and associated clamps installation on RasGas-A platform in Qatar for Mc Dermott.
09/2005 to 11/2005: Free span correction using Grout bags on 10 pipelines varying from 24 to 46 between Kharg Island and Genave in Iran.
03/2005 to 05/2005: Installation of various 24 spools (24inch diameter) connecting PS1-K platform risers and pipeline end flanges in the IDD EL Shargi oil field in Qatar for SMOE / Qatar Petroleum.
03/2004 to 04/2004: Installation of 24inch and 2.5km long HDPE subsea line from Halul Island to water disposal platform in Qatar for Qatar Petroleum.
10/2003 to 02/2004: Instillation of 42inch and 4.5km long offshore pipeline using on bottom pull method, pipeline end manifold (PLEM) and CALM buoy inclusive of chains, piles, mooring hawsers and flotation hoses in Iran for Gulf Piping Company / National Iranian Oil Company.
07/2003 to 08/2003:Turntable buoy replacement at berth IM1276 Total South pars in Iran for National Iranian Oil Company.
Eductation
08/1995 to 07/199: Addis Ababa University, Faculty of Technology in Addis Ababa - BSc in Mechanical Engineer
Certification
2002: TUV Akademie Middle East (RWTUV) in Abu Dahabi - Certificate in Subsea Pipeline Engineering
2008 : Orcina Ltd. Houston, Texas - Certificate in OrcaFlex Training.
Sea Survival : 22nd Nov 2012
Basic First Aid : 01st Sept 2012
Basic Fire Fighting: 23rd Nov 2012
HUET: 16th April 2010
Offshore Medical: 15th Feb 2012
Hot Categories
Chemicals
Batteries