Egypt Zones accountACCOUNT

cv


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 4 years
Relocation: Yes - Internationally

Industry Experience
4 years Civil Engineer

Career Objective

am looking for a good position in a company specialized in the field of Design & Construction which will provide me with an excellent opportunity & encourages continuous education and development of its employees to establish a recognizable career

Professional Experience

Work Experience.
 Contrade company, from 1/4/2008 till present.
# Project name: katamia technology center. "New Cairo, Egypt"
Job tasks:
• Following up excavating works
• Following up leveling and compaction works for KTC,Namaa44,Namaa75.
• Following up the concrete works the project.
• Following up the finishing works the project
• Setting out all technical office work for the project.
• Setting out all technical office works for centeriun project “New Cairo”.

Katamia technology center is Administration Building of area 4000 m2 consist of 5 floors in addition to basement &ground floors. The total cost of the project is about 30 million L.E.
# Project name: ACDIMA Company. "AL OBOUR, Egypt"
Job tasks:
• Following up excavating works
• Following up leveling and compaction works.
• Following up the concrete works the project.
• Following up the finishing works the project

ACDIMA is administration Building for Drugs Company of area 4000 m2 consist of 3 floors in addition to basement &ground floors. The total cost of the project is about 36 million L.E.
 El Katameya for real estate investment, from 1/4/2007 till 30/3/2008.
# Project name: El Katameya down town. "New Cairo, Egypt"
Job tasks:
• Following up the concrete works for buildings" 2 & 3".
• Coordinate& setting out all the Technical office work.
• Following up the Finishing works for building" 3".

Buildings "2 & 3" each of them nearly 4000m2 areas, consist of 6floors in addition to basement & ground floors. These represent 20% of the area of project.
The total cost of the project is 750 million L.E.
 Aquarius for real estate investment, from 1/9/2006 till 30/3/2007
# Project name: Aquarius Resort (Ein EL-Sokhna)
Job tasks:
• Following up the concrete works for villas.
• Following up the Finishing works for villas.
• Following up the land escape works for resort.
• Following up the concrete works for ground tanks.
• Following up the Finishing works for ground tanks.

El-nada zone consist of 17 villas lay at the red sea beaches at "el ain el sokhna”, which have Aqurious resort. The total cost of the project is 100 million L.E.

Eductation

Education.

• 2002 - 2006 student at Faculty of Engineering - Zagazig University.
• 2006 B.Sc. in Civil Engineering.
• Graduation Project: Advanced structure analysis" tall building”.
• Graduation Project Evaluation: An excellent grade.
• General grade; Good (69%).
• Graduate year: May 2006.

Notes of Graduation Project

• Designs a tall building structure consist of 30 stories of area more than 1000m2.
• The building is skeletal structure.
• The building is flat slab.
• And we make all detailed sketches that show that by using "SAP2000" to designing it and use "AUTOCAD" in drawing all sketches.

Additional Information

Professional Training

• Training in faculty for 5years in design work & field survey.
• Training in many sites.

Languages.

• Arabic: Native language.
• English: Good.
• French: Fair.

Computer Skills.

• Primavera.
• AutoCAD.
• SAP 2000.
• CSI Design col.
• Etabs.& Safe
• DRCS.
• MS-office.
• Internet.
• Good knowledge of the computer hardware

Survey Skills

• Working on any kind of thetiolites & levels.

Activities.

• Sports o Running.
• Martial Arts.
• Reading o Poetry, Novels, History
• Search
Personality.

• Considered by others to be dependable, possessing high work ethics.
• Ready to accept challenge.
• Willing to relocate and accept responsibility.
• Hard worker and ready to work under stress.
• I usually want the best work &looking forward to all new techniques in civil engineering.
• I believe I have the right skills to bring useful ideas to a problem, communicate those ideas effectively and play apart in bringing them fruition.
• While there are many skills and approaches I’m not yet familiar with, but I believe I have the self-motivation and determination to gain more experience in real-world practices and skills.
• Ability to work independently& as an effective team member.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.