Egypt Zones accountACCOUNT

instrument engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 5 years
Relocation: Yes - Internationally

Industry Experience
5 years Engineer

Career Objective

DCS,PLC,SCADA,Field Instrument etc.

Professional Experience

1. IPCL – Baroda (Project Executor)
DCS (TDC-3000) system of NCP (Naphtha Cracker Plant) was Expanded and upgraded.

1.1 APM (Advance Process Manager) converted to HPM (High Performance Manager).

1.2 HM (History Module) Upgraded.

1.3 ESVT (Experion Server TPS) Node provided to have the benefits of the window base utility. With the help of ESVT node OPC connectivity given to IT network.
Expand: - New HPM controllers configured and installed in the system.

2. Release Upgrade activity at ESSAR – Steel, Hazira & IPCL – Dahej.

3. IOCL – Gujarat Refinery: - (TDC300)
Engineering application implementation as well as graphic configuration done for the MSQU (Motor Spirit Quality Up gradation) project.

4. RIL – JERP Project – Jamnagar.

4.1 Work as a team leader for the erection and commissioning of world’s largest Fire & Gas and CCTV system.
4.2 F&G System of JERP supplied by M/s. Honeywell. This system consists of almost 12000 I/Os, 4 redundant EPKS servers, 15 workstations, 210 Cabinets (System + Network + Marshalling), 33 no. Safety Manager PLC, 33 Fire Alarm Panel, Plant Historian Server, IMAC (Information Management and Control) Server, Network Management Software Server (Primary + Secondary), Experion Backup and Restore Server. Above on these all, the latest field devices like DGC,DGT,DGX,DSX,DSO,DSM,DHF,DHC,DGCO,DHE etc. F&G system has 226 Km Fiber Optic Network to connect all the PIBs (Plant Interface Building) with Central Control Building.

Site Acceptance Test performed for F&G system.

4.3 CCTV system consists of 96 cameras (Pelco Make), 55 Km Fiber Optic Network, 2 Database server, 8 workstations, 10 camera server, 13.2 TB server also.
4.4 Preparation of Standard Maintenance Procedures for F&G and CCTV system.

4.5 SAP codification of tools and tackles which is used for the F&G and CCTV system.





Experience : 1) Employer : Atul Ltd.
Duration : From: 01/07/2005 to: 22/07/2006

2) Employer : Honeywell Automation India Limited
Duration : From: 23/07/206 To 07/12/2007

3) Employer : RIL – Jamnagar.
Duration : From: 10/12/2007 To 20.06.2009.

4) Employer : Cairn Energy India Limited
Duration : 30.06.2009 onwards.

1) Commissioning of ICS (Integrated Control System) at Cairn Energy India Limited at Mangala Production Terminal (MPT) at Barmer – Rajasthan.

Eductation

Particulars
Passing Month Year
%
Class
SSC
MARCH 1997
82.57
DIST
HSC
MARCH 1999
65.15
FIRST
DIC
MAY 2002
82.81
DIST
PARTICULARS
PASSING YEAR
MARKS
%
CLASS
SEM III
DEC 2002
483/750
64.40
FIRST
SEM IV
JUNE 2003
540/750
72.00
DIST
SEM V
DEC 2003
548/750
73.06
DIST
SEM VI
JUNE 2004
553/750
73.73
DIST
SEM VII
DEC 2004
540/750
72.00
DIST
SEM VIII
JUNE 2005
468/600
78.00
DIST

Certification

Honeywell systems training at Pune for one month period.
Yokogawa CS3000, Prosafe, Stardom system training at Bangalore for 10 days.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.