Asset Integrity and Reliability Policy for LNG-plant, refinery plant, maintenance work to analyze plant/ equipment availability.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 19 years
Relocation: Yes - Internationally
Career Objective
Asset Integrity and Reliability Policy for LNG-plant. I also have experience in turnkey power sub station project, petrochemical plant project for fabrication and construction with international code/ standard.
Professional Experience
8.1 ADGAS LNG Plant, Das Island Abu Dhabi:
Mechanical Supervisor, (June 2004 – Present) Performance and Reliability Department: PIRR Project, Plant Integrity Reliability and Recertification Project. Improving integrity of Train 1 & 2 Piping Project: Critical piping replacement plan for shut down 2005. Assist to Det Norske Veritas (DNV) to Review/verify the integrity condition and remaining live of independent equipment. Issue assessment study report.
Engineering Department: for Piping and Mechanical Structural. Steam System Management Project, SSMP. Provide Tie-in Point for OAG Projec, Offshore Assosiated Gas Project; Provide Independent Gas Connection from Common Crossover to Defrost Gas Section.
8.2 PT. CHANDRA ASRI, Olefin plant – Cilegon:
Senior Mechanical Engineer: Review design engineering, analyze plant/ equipment availability, evaluate the problem to the equipment down time, Feasibility study for plant modification to improve plant performance include HAZOPS/ HAZID preparation. Project planning and evaluation for any modification to improve plant performance. Bid preparation, Prepare bill of Quantity, specification and material ordering. Selecting vendor for maintenance/ TAM work. Furnace restoration for Naphta cracker.
8.3 LURGI, Lentjes Bischoff GmbH, Public work:
Construction Engineer: Review design drawing, shop fabrication, steel work erection, scrubber and platform. Equipment installation and pre-commissioning for 2x610 MW coal fired plant.
8.4 PT. GT Petrochem, Ethylene refinery plant – Cilegon:
Mechanical Engineer: Plant maintenance and modification for existing line-1 Ethylene Oxide 80 000 TPA.
Construction and commissioning for Ethylene Oxide and Ethylene Glycol refinery line-2 expansion project 120 000 ton per annum capacity for: static and rotating equipment.
8.5 PT. Persero Brantas Abipraya, General Contractor:
Major Job: Cost estimating and marketing, project negotiation contract clarification, budgetary planning, project control for Hydro Electric Power Project and Plant expansion. Erection work for Gas Insulated Switch Gear (GIS). Transformer installation 2x50 MVA and 2x60 MVA, panel relay control and protection of NISSIN Electric and FUJI Electric. Heavy duty equipment maintenance/ recondition management, equipment plan production control, maintenance cost control, Availability/ Utility equipment evaluation.
Eductation
Qualification : Bachelor's Degree
Field of Study : Engineering (Mechanical)
Major : Mechanical
Institute/University : Brawijaya University - Malang, Indonesia
Graduation Date : 1989
Certification
- Finance management for manager, 20 hours by Lembaga Management Surabaya .
- Applied Marketing, 18 hours by LMS
- Total Quality Control by Company.
- Master Business Administration, major in Finance, Production Planning, Marketing management by Jakarta Institute of management JIMS 1999.
- Engineering Procurement Construction, PIPI .
- Process Design and Engineering in Practice for Showa Denko Petrochemical Plant on Ethylene/ Polyethylene Plant, Toyo Engineering From July 2000 to May 2001.
- Microsoft Project Server 2002 Profesional, by Mitranet & Microsoft. September 2002.
- Accident & Incident Investigation, by Patria Utama Jakarta. 11 – 13 November 2002.
- Permit to Work Training, by GASOOS bin Hamodah – Abu Dhabi. 30 January – 1 February 2005.
- Microsoft Office 2007, by CompuBase – Abu Dhabi. 10 July 2008.
Additional Information
I am 47 years old graduated from mechanical engineering of state University. I am specialized in maintenance work to analyze plant/ equipment availability, evaluate the problem to the equipment down time/ MTBF, maintenance planning. I am employed by ADGAS LNG Plant in Performance and Reliability Department for Mechanical Supervisor to handle Piping Integrity Improvement Schema, prepare Recommendation and Repair Report. I operate MS Project Server 2002 to build virtual project office and other Microsoft Office application.
Hot Categories
Chemicals
Batteries