Egypt Zones accountACCOUNT

welding inspector


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 14 years
Relocation: Yes - Internationally

Industry Experience
8 years Quality Control/Quality Assurance Engineer
4 years Quality Control/Quality Assurance Engineer
1 years Quality Control/Quality Assurance Engineer

Career Objective

Seeking a challenging job in a company where my skills & experience would help to promote the goals and success of the organization.

Professional Experience

• A TOTAL OF MORE THAN 14 YEARS OF EXPERIENCE IN THE FIELD OF QUALITY CONTROL, WELDING INSPECTION AND NDT INSPECTION.
• WELDING AND DIMENTIONS INSPECTIONS OF VESSELS, STRUCTARALS, PIPING AND FABRICATIONS, ERECTION SUPERVISION AND COORDINATION.
• WELL VERSED WITH ISO 9001-2008 DOCUMENTATION AND INTERNAL AUDITS.
• IN-DEPTH KNOWLEDGE OF INDUSTRIAL PROCEDURES, QUALITY CONTROL RELATED ACTIVITES.
• GOOD EXPERIENCE IN PLANT PIPING.
• HYDRO-TESTING OF PIPING SYSTEM.
• GOOD EXPERIENCE IN PIPING,CLASS 1 CLASS 2 PIPELINE WORKS FLOW LINES, WATER INJECTION LINE, ON PLOT, OFF PLOT, WELDER QUALIFICATION, PROCEDURE QUALIFICATION ,WITNESSING WELDING TEST.
• USED CODES AND SPECIFICATION API 1104, 31.1, 31.3, 31.4,31.8, ASME SEC IX D1.1,SPECIFICATION FOR FLOW LINE FOR CLASS 1 AND CLASS 2&3.
• EXPERIENCE IN PENETRENT TEST, MAGNETIC PARTICLE.
• EXPERIENCE AS A WELDING QC SUPERVISOR.
• EXPERIENCE IN TEACHING A HIGH SKILL WELDING.
• REVIEW AND COMMENT ON MATERIALS,PROCEDURES, ITP, METHODE STATEMENT, etc
• REVIEW THE ENTIRE MATERIAL TEST CERTIFICATE AND DOCUMENTS AS PER QUALITY PLAN, P.O & SPECIFICATION AND GIVEN DISPATCH CLEARENCE FOR FINISHED PRODUCTS.
• LINE CHECKING; PUNCH LISTING (TEST PACKAGE CLEARING).
• WRITING DAILY AND WEEKLY REPORT

Eductation


EDUCATION
DIPLOMA IN MECHANICAL ENGINEERING

PROFESSIONAL QUALIFICATION
 CSWIP 3.1 WELDING INSPECTOR. (TWI-UK). CERTI: NUMBER # 30098, 2007.
 ASNT-LEVEL II – RT.PT, UT AND MT.
TRAINING ATTENDED
1) ISO Internal Auditor course, ISO 9001:2008
2) Computer training course (MS word, Power point and Excel) training center.

Additional Information

EXPERIENCE IN PLANT PIPING
Worked in plant piping (lines are ACID, GAS, CAUSTIC, ETHANE, METHANOL, BUTANE, SALESGAS, CRUDE OIL, FIRE WATER, and UTILITY).
 ARAMCO METERING FACILITIES OFF-PLOT PIPELINE.
(Code: B31.3/Aramco Spec) Total of four lines- Total of 110 km.
NPS 20” STD API 5L B for Methane line, NPS 16” STD API 5L B for Butane, NPS 16” STD API 5L B for Fuel Gas. NPS 8” API 5L B STD for Crude Oil.
 SAUDI KYAN PETROCHEMICAL COMPLEX OFF-PLOT PIPELINES.
(code: B31.3/Saudi Kayan Spec) Total of 16 lines- Total of 275km.(Off plot).
NPS 3” HX std A106-B,8” BNZ std A106-B,AT 3” SCH 10 SS304/A312,TEG 4” SCH 10 SS304/A312,DEG 6” SCH 10 SS304/A312,MEG 12” std SCH 10 SS304/A312,PRY 8”XS A333-6.
 DUTIES AND RESPONSIBILITIES PERFOMED.
(SAUDI ARAMCO METERING FACILITIES PROJECT).
• Verify that correct materials are utilized for all works.
• Be familiar with and refer to the applicable SAIC, Specification and standards.
• Ensure that copies of applicable QC plan (and QC procedures where necessary) are available at the location of work.
• Ensure that all the welding works carried out in the service contract are as per the approved procedure and plans.
• Witness welder qualification test in association with the company representative and welding engineer.
• Ensure that the welders are qualified to the WPS.





Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search
200-Engineering Hydrostatic Testing  News Inspection  News Laboratory Services  News Non Destructive Testing  News Testing  News Testing & Inspection Services  News
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
Egypt Zones
Copyright Universal Solutions All rights reserved. - Privacy Policy.