Project Engineer/Piping Engineer with 15 years experience in Construction of Oil/Gas & Refinery Projects
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
Analyze the scope of work and prepare logical plans and schedules, taking into account the availability of design documentation, equipment and material deliveries, manpower availability and sequence of work completion.
Professional Experience
Project Co-Ordinator Worked as Project Co-Ordinator with M/s. INTEGRATED SPECIALIZED GENERAL CONTRACTING COMPANY W.L.L. (ISCCO) Abu Dhabi.(From Oct.2008 to March 2010)
This company is engaged in the construction work, mainly piping jobs for GASCO and TAKREER. Reporting to the Operations Manager, I managed a work force of 180, including Supervisors and Engineers.
Main Achievements : Worked as Project Co-Ordinator for the following two projects :-
(1) Enhancement of existing drinking water facilities in AGD-0 plant at ASAB, for GASCO.
(2) Replacement of cooling water piping system in TAKREER plant at Sas Al Nakhl.This project included one month shut-down work. Both the projects are successfully completed with zero accident.
Responsible for monitoring works, control the third party contractors, site supervision, approval of deliverables, compliance with project targets.
Co-ordinate with other departments to guarantee all contractors works are carried out with common target of optimizing.
Planning, scheduling, implementation, co-ordination, inspection and hand over of projects.
Worked as Sr.Project Engineer with M/s. CHIYODA SINGAPORE (PTE) LTD Singapore for the Sour Water Stripper 1 & 2 Project, for Shell Eastern Petroleum at Bukom Refinery, Singapore.(From Oct.2007 to March 2008)
Responsibilities :
Analyze the scope of work and prepare logical plans and schedules, taking into account the availability of design documentation, equipment and material deliveries, manpower availability and sequence of work completion.
Develop construction work execution strategies and work methods in line with budget costs, quality requirements and to highest safety standards.
Ensure that the construction requirements are realistically quantified and incorporated into the project budgets and planning system.
Worked as Project Engineer with M/s. AL BANNA ENGINEERING,for the Phase III Project, for Star Energy, Jebel Ali, Dubai.(From May 2004 to July 2007)
Responsibilities :
Prepare scope of work and identify potential variations in costs and the scope of work.
Preparing, controlling document for project correspondence including approval & submission of reports.
Implement and organize any approved modifications to the project, ensuring all changes are fully documented and included in the appropriate documents.
Eductation
Mechanical Engineering (B.Sc. (Engg.) completed, (not passed)
Hot Categories
Chemicals
Batteries