Mechanical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 16 years
Relocation: No
Career Objective
Pipeline Foreman in any places of the world or Field Engineer Construction facilities
Professional Experience
SOPETROIL Petroleum Services Company
Charge: Projects Superintendent February 2010 - Actually.
PROJECT: Procure & Construction of ,GASLINES 77 Km
8 5/8” O.D., 6 5/8”O.D.,4 1/2” O.D,etc.
PROJECT: :
• Construction and assembly of 250.000,00 bls atmospheric tank
Client: PETROINDUSTRIAL – ECUADOR
ORIENCO S.A. Petroleum Services Company
Charge: Projects Manager August 2008 – February 2010.
PROJECT: Engineering Procure Construction, PIPE LINE 83 Km
12 3/4” O.D., 16” N.D., 6 5/8” O.D.
• Construction and assembly of launcher-receivers pig trap
• Installation of SCADA SYSTEM
• Instillation of Leak Detection System
PROJECT: Construction, FLOW LINES, REINJECTION LINES,
GASLIFT LINES, 520 Km, 26”, 20”,16”,12”, 10”,8”, 6”,4”, 3 1/2” N.D.
Client: PETROPRODUCCION – ECUADOR
SKANSKA L.A. Petroleum Services and Construction Company
Charge: Building Boss; Block 18,
Client: Petrobras
Projects:
• Construction of steel enclosing CPF, Well pad B and C,
• Water injection system at CPF.
• Recondition of chemical injection system in Well pad B and C.
April 2007 – Julyl 2007
GASDYNCA CIA. LTDA.. Specialized Engineers
Charge: Designing Engineer. February - 2007 - April 2007.
PROJECT: ENLARGMENT OF FOUR PLATFORMS,
Client: REPSOL-YPF. BLOCK 16.
• Detail Engineering:
Control of planes P&ID´s
Routing of petroleum production pipe lines
Control of isometric planes
Elaboration and details of materials list.
Elaboration of bases and design criteria of the mechanical area.
TECTOTAL CIA. LTDA.. Petroleum Services Company
Charge: Superintendent. November 2006 - January 2007.
PROJECT: Engineer Procure Construction, UPGRADING GAS BLANKET IN NPF, BLQ. 16,
Client: REPSOL - YPF
• Detail engineering:
• Control of spools prefabricated, of 10”, 8”, 6” , 4” and 3”diameter ASTM A106 pipes.
• Assembling of a Scrubber and pipes.
• Hydrostatic tests and commissioned.
ORIENCO S.A.
Charge: Projects Boss March 2006 - November 2006.
• Offers development:
• Manager Project: “Construction of pools and bio-saving at VHR field.
Client: Petroproduccion June 2006 – November 2006.
• Project Boss: “Fabrication and assembling of 24 Ton. Of steel structures, enlargement of production line (Double Puller Track) in Latacunga
Client: CEDAL July 2006 – November 2006
Eductation
College
1993 Escuela Politécnica Nacional (Quito)
Mechanical Engineer
Hot Categories
Chemicals
Batteries