Professional Experience
For the best experiences time of mine are from year of 2002 till 2009, I have joint ABB Industry Pte. Lte Singapore in 2002 as Basic level of position as CAD operator and QS for MSD Project so from this Project let me learn from Basic work level of how the 10 USD million system till end of 2002.
In 2003 – 2004, I was the Part of Design team for C2B Project; this project was the Changi Water Reclamation plant of Singapore and also has been Site Supervisor for Installation and Planning for my area.
In early 2005 I have promoted to be Design Leader team for Uong Bi 300 MW Extension Power plant project (Hanoi, Vietnam) we did project design in Singapore for about 6 months and then moved all team to Site office in Hanoi, Vietnam and I have promoted to Site Manager to handle all ABB work scope such as Installation High Voltage switch gear, Low voltage switch gear, Transformer, UPS, Under ground cabling system, cable trey, ladder, High voltage Motors installation and commissioning for all electrical system and also handing over to our customer.
Project finished at 2006.
Late 2006 I come back to Singapore for new project as Site Manager for Novartis Singapore Pharma Manufacturing. ABB scopes of work are installation all electrical work under our main contractor was Foster Wheeler Asia Pacific Pte. Ltd. till Jun 2007.
2007 I joint Foster Wheeler Asia Pacific as Electrical Supervisor for Bukom Refinery Modification (BRM) project this was 10 billion USD Project, as I work for main contractor company so I need to handle 3 subcontractor (ABB Industry, RNC and SWTS) with around 300 workers are under my responsibilities. Areas of my work scope are.
- Replacement of new 6.6kV switchgear for 3 switch houses
- Replacement of 6.6kV Transformer 6 numbers
- Replacement and New Installation of DC UPS, AC UPS
- Additional 6.6kV and LV switch boards
- Installation new HV Motors 12 Numbers
- Installation of new Underground 22kV, 6.6kV and LV cabling
- Earthing system for new Pipe racks
- Co-ordinate with Planning engineer
- Inspection, Punch list and handover