QA/QC Inspector (Welding) - QA/QC Representative
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
More than 10 years involving in construction,installation oil and gas Platform, Piping spools, Pipelines,FPSO/FPU,Pressure Vessel etc. Have strong skill level of supervision, inspection, technical problem solving all QA/QC including technical problem
Professional Experience
29th April 2016 – 02nd August 2017
Employer : GPS/Saipem Contracting Netherland BV. (Azerbaijan - Georgia)
Position : QC Welding Inspector
Project : South Caucasus Pipeline Expansion (SCPX) Project /Crosscountry Pipelines.
27th January 2014 - 09th September 2015
Employer : GPS/Saipem S.p.A. (Santos Basin Area, Brazil)
Position : QC Welding Inspector/ Pipelay Vessel Saipem FDS2.
Project 1 : Iracema Project
Project 2 : Pre salt Project.
Project 3 : Cernambi and Cabiunas – Lula_NE Project.
16th April 2012 - 26th September 2012/ 22th May 2013 - 23rd December 2013
Employer : GPS/Saipem S.p.A. (South China Sea, China).
Position : QC Welding Inspector/ Pipelay Vessel Saipem FDS2.
Project : Liwan deep water EPCI Phase 1 and 2
04th July 2011 - 17th November 2011
Employer : GPS/Saipem S.p.A. (Khasagan-Caspian Sea, Kazakhstan).
Position : QC Welding Inspector/ Pipelay Vessel Saipem Castoro 12.
Project : Khasagan Development Experimental Program.
04th April 2011 - 14th June 2011
Employer : PT. VME Process. (Batam, Indonesia).
Position : QC Welding Inspector.
Project : FPU (Floating Production Unit) Terang Sirasun Batur.
23rd August 2010 - 28th March 2011
Employer : PT. Hanjung Indonesia. (Lampung, Indonesia).
Position : QC Welding Inspector.
Project : Gorgon Project Barrow Island LNG Plant.
15th June 2009 - 14th March 2010
Employer : PT. Mc Connell Dowel Services. (Batam, Indonesia).
Position : QC Welding Inspector.
Project : Singapore Parallel Train (SPT) of Exxon Mobil Chemical Asia Pte. Ltd.
Pipe Racks (PARs/SBRs) and Assosiated Piping (Pipe Spools Fabrication CS/SS/CuNi).
26th March 2007 – 26th March 2009
Employer : PT.Surveyor Indonesia. (Batam, Indonesia).
Position : QC Inspector.
Project : WHP C & D Peciko 5 .
(Fabrication at PT Nippon Steel Batam) – PT.Total Indonesie E&P.
08th January 2007 – 15th February 2007
Employer : PT.Menara Gading Putih. (Porong,Jawa Timur-Indonesia).
Position : QC Welding Inspector.
Project : Relocation of Onshore Gas transmition Line.
28”OD Carbon steel pipeline.
26th October 2006 – 02nd December 2006
Employer : PT.Bina Rasano Enginering. (Bekasap Duri, Riau-Indonesia).
Position : QC Inspector.
Project : Piping maintenance Project Rur-Lt SLN (South Light North Sumatra).
Eductation
Bachelor Degree in Mechanical Engineering, Andalas University, Padang-Indonesia
Certification
CSWIP 3.1 Welding Inspector certified by TWI-UK, certificate no: 45711/2
Welding Inspector – certified by B4T Bandung, 2006, certificate no: 0906.12.601533.
Attendance API 570 Course - Piping Inspector – conducted by Ladwer Institute Batam, 2016. Certificate no: 321/0216/I/LI.
NDT PCN Level 2 Radiographic Interpretation – EN ISO 9712. PCN number: 332382.
NDT ASNT Level 2 MPI –ASNT-SNT-TC-1A, 2011 Edition. Certificate no: MT-R1057.
NDT ASNT Level 2 PT –ASNT-SNT-TC-1A, 2011 Edition. Certificate no: PT-R1057.
FOET–OPITO standards, certificate no: 93925808 2005144184 Expire Date 19 May 2018
Hot Categories
Chemicals
Batteries