Petroleum Engineer in Belayim Petroleum Company PETROBEL; (A joint venture between Egyptian General Petroleum corporation and IEOC (ENI- AGIP)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Petroleum engineer at Sinai fields (Gulf of Suez) including Belayim land & marine fields
Professional Experience
Activities in the Petroleum Engineering Dept. at Sinai fields (Gulf of Suez) including Belayim land & marine fields:-
1) Follow up and report of the daily activities for drilling & work-over operations.
2) Supervise all offshore & onshore rigs (Open hole logs, Cased hole logs, production logging, perforations and well test. etc.
3) Design. ESP & Sucker Rod pumps completion.
4) Prepare Rigs Work Over proposals such as: Water shut-off, skin removal to improve well productivity, Acid Stimulations / Scale Inhibition Treatments., Adding Perforations , hydraulic fracture , sand control and pump upgrading .
5) Update reservoir studies according to new data from new wells , work over activities and production performance .
6) Prepare monthly and annual activity reports like ( ESP failure , ESP run life & Workover activity report).
7) Monitor and Follow up production activities, and analyzing the production data to verify matching with forecasts and to propose the necessary actions in order to ensure a cost effective reservoir management.
Supervision of well site operations for :
„« Cased hole logs Interpretation, PLT, TDT, CNL, CBL, USIT, CAST, and RST logs.
„« Water shut-off jobs by bridge plug, squeeze cement, straddle packer and expandable casing patch.
„« Perforations, casing gun, TCP gun .
„« Stimulation (Acid wash , matrix treatment, Acid fracture, Gravel-Pack and Pre-pack screen, Extension pack and Hydraulic fracture, Expandable screen)
„« DST ( drill stem test ) & Well testing ( build-up test , drawdown test , fill-up test , infectivity and fall-off test )
„« ESP installation with Multi-sensor.
„« Remedial CMT jobs (balance & squeeze).
Eductation
B.Sc. in Petroleum Engineering, Faculty of Petroleum and Mining Engineering, Suez Canal University, Egypt.
Certification
International Well Control Forum (IWCF) "Randy Smith", July-2009ˇ¨.
Additional Information
(Enhanced Oil Recovery) course, ˇ§GPC training center, 2002, Egypt
2) ( Advanced Well Logging ) course, ˇ§GPC training center ˇV 2003, Egypt
3) (Hydraulic Fracturing and Well Treatment ) ˇ§Cairo University, April-2005ˇ¨.
4) (Defensive Driving & Road Safety) ˇ§IEOC, June-2006ˇ¨.
5) (Well Completion & Work over ) ˇ§Cairo University, MARCH-2007ˇ¨.
6) (Oil & Gas Basic Surface Facilities) "Cairo University, MAY-2007ˇ¨.
7) (Water Flooding Design, Operations and Monitoring) "Oil & Gas Skills", NOV 2007
8) Corrosion control technique and material selection, (Petromaint), Alexandria,
Egypt.
9) (Petroleum Reservoir Management) "Suez Canal University, July-2008ˇ¨.
SOFTWARE TRAINING
1) Loadcala program for Sucker Rod wells Design.
2) Pump View ( ESP wells Equipped with Multisensor)
3) Special program for ESP integrity Design like sub pump
4) Petrobel MS Office (Word, Excel, Power Point and Outlook)
5) Loadcala ˇ§S/R pumps designˇ¨
6) OFM ˇ§Production data baseˇ¨
7) PROSPER
Hot Categories
Chemicals
Batteries