Egypt Zones accountACCOUNT

workover supervisor or drilling supervisor


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
20+ years Engineering - Drilling
20+ years Engineer

Career Objective

have 17 years driilling experiences,5 year .drilling supervisor experiences

Professional Experience

In1990~2004As drilling engineer , toolpusher, rig manager , chief engineer. As,a chief engineer,have been responsible for the 12 rig crew ¡®s drilling and 4 work over crew's technology. Have handled more than 50¡¯s drilling well accident, including down hole lost cone ,broken down pipe ,pipe sticking, mud lost circulation, cement lost circulation, etc. total finished work over well more than 2000,including casing repaired,elecric pump¡¯s stuck, check the pump,famillar with various down hole tools and drilling tools..

2005~2006 XinJiang Kelamayi oil field drilling supervisor.

In 2006 ~2007 in The Supervision and Technology Company of CNOOC, worked in the Operation Department as a drilling supervisor. have drilled for 22 oil wells:15 directional wells;7 horizontal well, in LD-10-1;HD32-6; B10 jack up; the longest horizontal section length is 450m.I have Participated the procedure of LD10-1 oil well¡¯s pipe stuck ,and the arrangement of QHD32-6-A28 oil well¡¯s pipe sticking and successfully overcome it.
2008~ in the year end Algeria as a drilling supervisor, BEL z-1 ,the TD is 4000m. horizontal section length is 600m
2009~ now in Chad as drilling supervisor.
Course Date Hold by
International Well Control training 2006 .09 Dagang international well control
B.O.S.S&H.U.E.T 2006.06 CNOOC
Well Cap training (no.313139) 2009 Shengli oil field


Eductation

Daqing petroleum university, bachelor, August 1986 ¨C July 1990

Certification

Course Date Hold by
International Well Control training 2006 .09 Dagang international well control
B.O.S.S&H.U.E.T 2006.06 CNOOC
Well Cap training (no.313139) 2009 Shengli oil field


Additional Information

good at dealing with drill down hole problem and workover repair.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
800-Drilling 200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Artificial Lift » News » Cementing, Stimulation » News » Directional Drilling » News » Drilling » News » Drilling & Well Services » News » Drilling Engineering & Equipment Systems » News » Logging, Perforating, Testing » News » Offshore Drilling » News » Reservoir/Completion Consultants » News » Workover & Well Services » News » Workover Rigs/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.