Shift charge Engineer For operation ,Maintenence,Testing, Commisioning of Substation Equipments, Power Plant equipments.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
To seek for an suitable opening where I can apply my technical knowledge,Managerial skills,interpersonal skills and contribute effectively to the organisation.
Professional Experience
PPN Power Generating Company Pvt Ltd.
Designation Engineer.
Capacity of plant 330 MW Combined Cycle Power Plant.
Period of Working October 11 2004 to December 31 2007.
Responsibilities
„«Start up, shut down and Emergency operations of 245 MW MHI 701F Gas Turbine, Hydrogen Cooled Generator (325MVA), 100MW Axial Exhaust Condensing Reheat type Steam Turbine with 16 stages, 230KV Switch Yard (Ring Bus), Triple Pressure Heat Recovery Steam Generator, and Water Treatment Plant using RO Banks.
„«Testing and Maintenance of 230KV & 6.6KV Breakers (SF6&Vacuum Circuit Breaker)
„«Condition Monitoring and Maintenance of transformers up to 325 MVA
„«Testing of Numeric and Digital relays at 230KV switchyard like Distance Protection, Differential, Earth Fault Relays
„«Condition Monitoring & Maintenance of transformers and HT/LT Drives upto 3 MW.
„«Study of Switchyard Modification, Relays Coordination and Settings.
„«Isolation and normalisation of Systems as per PTW System.
„«Preparation of Standard operating Procedures for SwitchYard, Transformers.
„«Internal Auditor for OHSAS 18001and ISO 14001 System.
„« Essar Power Ltd.
Designation Deputy Manager.
Capacity of plant 515 MW Combined Cycle Power Plant.
Period of Working January 5 2008 to August 8 2008.
Responsibilities
„«Start up, Shut down and Emergency operations of 3*110MW Frame 9E GE Gas Turbine, Hydrogen Cooled Generator (225MVA),185MW Steam Turbine , 230KV Switch Yard (1Main Bus &1 Transfer Bus), Heat Recovery Steam Generator ,and Water Treatment Plant.
„«Testing and Maintenance of 230KV & 6.6KV Breakers (SF6&Vacuum Circuit Breaker)
„«Condition Monitoring and Maintenance of transformers, Generatorsup to 225 MVA
„«ADWEA (Abudhabhi Water and Electricity Authority).
Designation Shift charge Engineer.
Period of Working August11 2008 to Till date.
Responsibilities
„« Operation of Ring Main System comprising of 400/220/132/33/11KV Grid Stations, Substations, Primary, TRM, QRM Upto 3000MVA
„« Responsible for the operation of around 1500 Substation, 22 Generators.
„« Load control in Substations, power plants and planning of the loading of Generators, Transformers and Substations.
Eductation
of India.
Academic Profile
Examination passed Board/College Year of Passing Percentage Marks
B.E. (Electrical) Govt College of Engg. 2001 71.3
HSC ARLM, M.H.S.S. 1997 90.4
PGDC NPTI 2004 81.6
MBA Annamalai University 2007 62
Diploma In Industrial Safety NILEM 2002 72
Hot Categories
Chemicals
Batteries