Egypt Zones accountACCOUNT

Shift charge Engineer For operation ,Maintenence,Testing, Commisioning of Substation Equipments, Power Plant equipments.


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 7 years
Relocation: Yes - Internationally

Industry Experience
3 years Other
2 years Other
1 years Other

Career Objective

To seek for an suitable opening where I can apply my technical knowledge,Managerial skills,interpersonal skills and contribute effectively to the organisation.

Professional Experience

PPN Power Generating Company Pvt Ltd.
Designation Engineer.
Capacity of plant 330 MW Combined Cycle Power Plant.
Period of Working October 11 2004 to December 31 2007.
Responsibilities
„«Start up, shut down and Emergency operations of 245 MW MHI 701F Gas Turbine, Hydrogen Cooled Generator (325MVA), 100MW Axial Exhaust Condensing Reheat type Steam Turbine with 16 stages, 230KV Switch Yard (Ring Bus), Triple Pressure Heat Recovery Steam Generator, and Water Treatment Plant using RO Banks.
„«Testing and Maintenance of 230KV & 6.6KV Breakers (SF6&Vacuum Circuit Breaker)
„«Condition Monitoring and Maintenance of transformers up to 325 MVA
„«Testing of Numeric and Digital relays at 230KV switchyard like Distance Protection, Differential, Earth Fault Relays
„«Condition Monitoring & Maintenance of transformers and HT/LT Drives upto 3 MW.
„«Study of Switchyard Modification, Relays Coordination and Settings.
„«Isolation and normalisation of Systems as per PTW System.
„«Preparation of Standard operating Procedures for SwitchYard, Transformers.
„«Internal Auditor for OHSAS 18001and ISO 14001 System.

„« Essar Power Ltd.
Designation Deputy Manager.
Capacity of plant 515 MW Combined Cycle Power Plant.
Period of Working January 5 2008 to August 8 2008.
Responsibilities
„«Start up, Shut down and Emergency operations of 3*110MW Frame 9E GE Gas Turbine, Hydrogen Cooled Generator (225MVA),185MW Steam Turbine , 230KV Switch Yard (1Main Bus &1 Transfer Bus), Heat Recovery Steam Generator ,and Water Treatment Plant.
„«Testing and Maintenance of 230KV & 6.6KV Breakers (SF6&Vacuum Circuit Breaker)
„«Condition Monitoring and Maintenance of transformers, Generatorsup to 225 MVA
„«ADWEA (Abudhabhi Water and Electricity Authority).

Designation Shift charge Engineer.
Period of Working August11 2008 to Till date.
Responsibilities
„« Operation of Ring Main System comprising of 400/220/132/33/11KV Grid Stations, Substations, Primary, TRM, QRM Upto 3000MVA
„« Responsible for the operation of around 1500 Substation, 22 Generators.
„« Load control in Substations, power plants and planning of the loading of Generators, Transformers and Substations.

Eductation

of India.
Academic Profile
Examination passed Board/College Year of Passing Percentage Marks
B.E. (Electrical) Govt College of Engg. 2001 71.3
HSC ARLM, M.H.S.S. 1997 90.4
PGDC NPTI 2004 81.6
MBA Annamalai University 2007 62
Diploma In Industrial Safety NILEM 2002 72

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.