QA / QC INSPECTOR PAINTING / COATING (Asghar Ali)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
Seeking for new and challenging position to utilize my abilities and qualities at high caliber atmosphere and want to improve my technical knowledge and skills in most reputable organization.
Professional Experience
09 Year and 11 Month Experience in Painting and Insulation Inspection at Various Places
07 Year offshore experience on PN ships and submarines (Offshore)
02 Year at Pipe line Project for fabrication shop and site (Gas, Oil and Polymer Plant)
11 Month at Fabrication Shop on Vessels, Columns, Filters, Piping and Storage Tanks
Eductation
UNIVERSITY / BOARD NAME DEGREE / CERTIFICATE YEAR
PASS MARKS
OBTAIN DIVISION
University Of Karachi Bachelor of Arts (BA) 2003 480/1000 2ND
Sindh Board Of Technical Education Karachi Diploma of Associate Engineer (DAE)
(CONSTRUCTION / MECHANICAL) 1999 3300/5300 1ST
Board Of Intermediate And Secondary Education Multan Matriculation 1994 575/850 1ST
Certification
1. BGAS/CSWIP 3/2 (BGAS ID No. BG 592785 Expiry Date 28-11-2013) TWI UK
PAINTING INSPECTOR GRADE 2 CERTIFIED - 2008
2. NON-DESTRUCTIVE TESTING (ASNT)
LEVEL-II RADIOGRAPHIC TESTING - 2008
LEVEL-II DYE PENETRANT TESTING - 2008
LEVEL-II MAGNETIC PARTICLE TESTING – 2008
Additional Information
Preparation of Report for painting and coating
Oil and water test in compressed air (Blotter Test)
Monitoring of weather condition (Air/Substrate Temperature, Humidity, Dew point and wind)
Inspection of surface should be dry and free from oil, grease, dust, moister and foreign matter
Surface preparation methods and Measurement of Profile, degree of cleanliness
Surface contamination and test for detection (Chloride, Nitrate, Sulfate Test)
Measurement of Air Pressure at Nozzle with Hypodermic needle Gauge
Abrasive cleanliness test (Vial Test)
Verification of Paint system from ISO and drawing
Verification of Batch No, expiry date, mixing procedure, induction time and pot life
Measurement of Wet and Dry film thickness
Holiday / Pinhole detection
Coating faults, causes and remedies
MEK Resistance (Solvent Rub) test
Preparation of Punch List and killing after rectification
Rubber lining internal side of vessel, piping, tanks, evaporators and filters
Adhesion, grease, oil and dust test
Verification of marking of orientation, caution, Centre of Gravity (CG)
Final QC check up before Box up
Preparation of Dossier for Painting and Insulation
Coordination with client for inspection, Punch List Killing and other issues
Hot Categories
Chemicals
Batteries