Instrument and Control Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 18 years
Relocation: Yes - Internationally
Career Objective
I would like to apply with your company for the position of an Senior Instrument Engineer where I can use my skills and previous oilfield experience to help you obtain your company's mission
Professional Experience
WORK EXPERIENCES:
FLUOR MIDEST, ABUDHABI (U.A.E.)
(1) Client : ABU DHABI GAS INDUSTRIES LTD (GASCO)
Project : HGCE (Habshan Gas Complex Expansion Project).
Duration : Jan 2008 to till
(2) Client : BECHTEL
Project : O G D III (GASCO) HABSHAN (U.A.E)
Duration : April 2006 to Dec 2007
(3) Client : GASCO
Project : MIU Proect. Ruwais, U.A.E.
Duration : March 2004 to March 2007
(4) Client : TECHNIP
Project : RUP Project, (Ruwais) U, A, E
Duration : Oct 2001 to Dec 2003
(5) Client : GASCO
Project : RDCS Project, Ruwais,U.A.E.
Duration : Nov. 1998 to March 2001
(6) Client : BECHTEL TCHNIP JV.
Project : OGD-1, HABSHAN,U.A.E.
Duration : May 1996 to June 1998.
(7) Client : ADMA-OPCO
Project : INST.REVAMPING PROJECT
Duration : April 1995 to May 1996
(8) Client : SAUDI BINLADIN GROUP
Project : ARAR POWER PLANT, SAUDI ARABIA
Duration : January 1992 to Dec.1994
(9) Client : ADWEA( ABU DHABI WATER AND ELECTRICITY)
Project : TAWEELAH-A, DESALINATION PLANT
Duration : May 1989 to Dec.1991
Eductation
Academic Qualifications : S.S.C. Passed in 1981
H.S.C. Appeared in 1983
Technical Qualification : I.T.I. In Insrtumentation passed in 1987
Diploma in Electronics & : Passed with First class.
Communication
Certification
Training: a) Attended Training and PTW (Permit to work) Certificate obtained
from ADCO Abu Dhabi Company for Onshore Oil Operations.
b) Attended Training and PICWs, Certificate obtained from GASCO and TAKREER Ruwais.
Additional Information
Involved in engineering activities covering of site survey, as-built documents and drawings. Verification of documents and drawings and also developing field sketches for field instrument supports, new field wiring diagrams, loop diagrams, cable routings, plot plans and instrument location drawings.
Responsible for the installation of field instruments, cable laying, glanding, termination and testing of cables. Resolve field engineering issues with client.
Responsible for the survey of the plant control system panels covering local field panels to main control room, unit rotating equipment control system panels.
Preparation of detailed control panel site survey report and establishing recommendations, for the replacement, upgrade or modification to the existing control systems for integration into the new ICS.
Worked with pre-commissioning/Commissioning team where work involved logic/programming modifications, trouble shooting of the New Control System. Loop checking and handover to end client.
Doing the job as per plot plans, wiring diagrams, loop diagrams, JB Schedule and instrument layouts etc.
Job involves calibration, loop checking and commissioning of all process control instruments of Bailey INFI 90 DCS System. Also involved in the live changeover from the existing control system to the new system on a loop by loop basis. Updating as built drawings and preparing handover dossier to as final acceptance for the project.
Hot Categories
Chemicals
Batteries