engineering
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
instrument supervisor
Professional Experience
MAY 2008
QATARGAS OPERATIONG COMPANY QATAR
MAY 2009
QATARGAS OPERATIONG COMPANY QATAR
MAY 2010
QATARGAS OPERATIONG COMPANY QATAR
APRIL 2010
QATAR PETROLEM (QP) QATAR
Currently working as SENIOR SUPERVISOR (E&I) with DESCON Engineering Qatar L.L.C.
Project: QATAR GAS PROJECT (QATAR)
Client: QATAR GAS
Duration: 21 APRIL 2009, To Till Date
Responsibilities:
Working with descon engineering on various EPC projects up gradations like
To installation of new ULTRASONIC FLOW METER. Calibration ,commissioning
Upgrading of FLOW COMPUTER at sour gas line ,wet gas line, dry gas line and spare gas line
Installation of temperature transmitter, pressure transmitter as per hookup DWG
Upgrading of PILOT EYE for flare flame (LP AND MP, HP) installation termination, commissioning
Of pilot eye
Upgrading of MAGNATIC FLOW METER at desalination units. Installation commissioning
and calibration of transmitter
work on BIO GEORGE SYSTEM at sea water out fall
installation commissioning and calibration of BIO GEORGE sampling unite for three numbers of trains
purgation of H2S ANALYZER installation of analyzer probe analyzer transmitter make ABB
installation calibration commissioning of absorber
installation of CL2 ANALYZER commissioning calibration of CL2 analyzer sample unit
work on SUPHER LOADING ARM installation calibration and commissioning of loading arm
installation solo run of DOZING PUMPS, SAMPLE PUMPS, TRANSFFER PUMP
Project: RAS LAFFAN OLEFIN PROJECT (QATAR)
Client: TECHNIP
Duration: 09 OCT 2007, 20 APRIL 2009
Responsibilities:
I am involve in the Plant Field Instrumentation(HART & FIELD BUS FOUNDATION) Pressure, Temperature, Flow, pressure differential Level, transmitters , installation, inspection, testing and commissioning
Pneumatic & Motor operated valves Installation, Inspection, Testing and Commissioning
Perform preventive, corrective and troubleshooting maintenance, and testing of all Plant Instrument Process Monitoring
Control Protective equipment, calibration, repairing and maintenance of different type of smart transmitters, control valves, ON OFF valves, switches (Temperature, Pressure, Flow and Level) pneumatic transmitter. Calibration of smart transmitter’s pressure, level, flow and level with Hart communicator
Eductation
Matriculation :Governament Compony Hensive High School Sargodha Pakistan
D.A.E(Electronics:Govt Poly Technical College Sargodha Pakistan
DIVISION: 1ST
Certification
• MS Office (MS Excel, MS Word, MS Power Point, MS Vision)
• Good Internet skills
06 month Training Certificate in Instrumentation & Process Control and training of Siemens S7 plc from SIT Institute of Engineering & Technology Training Center Lahore PAKISTAN.
.
Additional Information
TRAININGS
SAFETY
1)3 days training course of shut down progress monitoring system by QATAR GAS.
2)4 hours H2S & breathing apparatus certificate course conducted by QATAR GAS.
3)4 hours environmental awareness course conducted by QATAR GAS.
4)4 hours incident & injury free course conducted by QATAR GAS.
5)4 hours permit to work receiver course conducted by QATAR GAS.
6)4 hours electronic permit to work (EPW) receiver course conducted by QATAR GAS.
7)8 hours consolidate permit to work (CPW) receiver course conducted by (RASS LAFAN INDUTRIAL CITY) QATAR
8)8 hours H2S/B.A Training Course from NATIONAL ACADEMY PROFESSIONAL TRANING IN DOHA QARAR
9)Safety induction certificate from Qatar Petroleum (GAS OPERATION) QP
LANGUAGE
1)URDU Very good
2)English GOOD
3)ARABIC GOOD
Hot Categories
Chemicals
Batteries