Inspection Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
I would like to build a challenging career in a reputed corporate firm where I can refine myself through an experience of more than 9 years and in turn contribute towards the progress of the corporate expectations.
Professional Experience
ľ Prepare/approve Quality Control Plan for all the Major Projects, normal maintenance activities, planned and unplanned unit shut downs etc.
ľ Review the technical project TSR and MOC packages, assist area inspection engineers for all the repair works in their respective area and assist to issue inspection report accordingly.
ľ Plan and coordinate Mechanical Maintenance activities with other departments and sections.
ľ Implements Inspection Policies and Procedures in cooperation with Technical Inspection Engineers & Project Planners.
ľ Participates in the installation, repair and maintenance of a variety of mechanical equipment and systems.
ľ Supervises all on-stream and shutdown inspection activities for stationary equipment, piping systems and pressure relieving devices, by assessing deterioration mechanisms, corrosion monitoring and investigation of failures.
ľ Prepares data to implement and update the Risk Based Inspection (RBI) methodology to enhance Equipment and Piping network Integrity and Reliability; in order to optimize inspection frequency.
ƒæ Provides advices on repair techniques, materials selection, welding procedures, inspection/testing requirements, and participate in plant modifications (MOC¡¦s) and projects.
ľ Witnessing the condition of safety relief valves and prescribes repairs based on pre pop testing result, witness relief pressure setting and issue PSV monthly report.
ľ Review project proposal packages and design documents regarding materials selection and
mechanical integrity, perform shop and field inspections and review QA/QC documents, method
statements etc. during project execution.
ľ Revising the Plant QA/QC Procedures
ƒæ Revising the WPS Manual by qualifying new procedures, approving the contractor¡¦s quality procedures, inspecting the daily project activities etc.
ľCompleted hot tapping/ stoppling of the HVGO line to remove the entrapped rings inside the strainer. The line is 5 Cr material with PWHT requirement, minimum Preheat temperature of 175oC has been maintained during hot tapping/ stoppling activity and the stoppled area shall be kept above pre heat temperature up to the next outage to avoid brittle fracture.
Eductation
B-Tech in Mechanical Engineering
Certification
ASNT NDT Level-III in Magnetic Particle Testing
AWS- CWI
Additional Information
Familiar with codes, Standards and Specification like AWS, ASME, ANSI, API, ASTM & NACE. Having good knowledge in different processes of welding and able to make different procedures for NDT, stress relieving etc. Developed a procedure for the welding of Hastelloy materials with super austenitic stainless steels. Well conversant with temper bead technique, hardness controlled deposition etc. Familiar with the calculation of the minimum time required for out gasssing of in-service equipments/piping in H2S/HF services to eliminate diffusible hydrogen prior to welding, based on Chevron Model.
Hot Categories
Chemicals
Batteries