a principal with Namvaran Consulting Engineers Managers Co., has 13 years of project execution, unit operation, commissioning. His extensive experience includes the overall responsibility for Control Engineering, Pre-commissioning, commissioning Engineering, construction, and start-up of oil and gas refining, petrochemical, utilities and storage tanks. His experience covers all project phases from feasibility studies, preparation of feed package, and EPC project execution to start-up and operational troubleshooting. He has good experience in execution of Oil / Gas refinery and petrochemical plant Start-Up.
He has started-up crude distillation, NHT, Catalytic Reforming and Amine sweetening units in Lavan Refinery. Also, he has good experience in operation of Reception facilities, and utilities such as water desalination/Storage Tanks / Demineralization, Steam Boilers, Air , Fuel systems, Condensate / Condensate Back up Stabilization, Amine sweetening, Ethane Recovery units in Phases 4&5 of South Pars Gas Co. Besides, he has experience in commissioning and start-up of Reception facilities, NHT unit, CCR unit, storage tanks, utilities and off site in 4th Aromatic Petrochemical plant.
He was an expert start-up team leader in trouble shooting, Catalyst Loading / regeneration of many Catalytic units such as NHT, ISOM, CCR and Conventional Catalytic Reforming.
Before joining Namvaran consulting Co., Mr. Molaie served as site Supervisor with Energy Industry Engineering Design Co.-EIED for 3 years in 4th Aromatic Plant (The biggest Aromatic Plant) in Assaluyeh port. He has good experiences in start-up of CCR, NHT, Storage Tanks, Fuel Gas and Drainage System. He also served 3 years with ENI Co. (with Dietsmann as sub-contractor) as Process units Instructor and start-up supervisor, in 4&5 Phases of South Pars Gas Company in Assaluyeh. He started his career with National Iranian Oil Co. for more than 6 years in process design, engineering, and start up of Crude distillation, Naphtha Hydro-treating Unit, Catalytic Reforming Unit and Amine sweetening Unit in Lavan Refining Co. He served as Operator and Boardman of Gas Plant, Naphtha Hydro-treating Unit, Catalytic Reforming Unit of Abadan Refining Co.
PROFESSIONAL REGISTERATIONS.
Associations of Professional Engineers of Ontario
Eductation
EDUCATION: Master's Degree
1989-1993 B.S. in Chemical Engineering Shiraz University-Iran
1995-1997 M.S. in Transport of Phenomena Mazandaran University-Iran
Certification
-Advanced and Manipulated Process Control in JAPAN COORPORATION CENTER.
DCS (Distribute Control System) by FISHER ROSEMOUNT Agency in Iran.
-"Provue Operation Course" (DCS) BY Fisher-Rosemount
-Advanced EMS Auditor Course by SGS
-Manufacturing & Documentation - Iso 14000
-Auditor Training Course-OHSAS 18001
-Physical & Chemical Water Treatment
-Catalyst & Variables in Refineries
-Introduction to Steam Boiler
-Heater and Furnaces
-Occupational Safety and Hygiene
-ISO 9002 preparation team.
-ISO 14000 & 18000 series Auditor term.
-ISO 14001 Lead Auditor term.
-IMS & EFQM
Additional Information
- PSVs check / FLARE Commissioning
- Vessels and Reactors Check out
- P&ID Mark up-As built at site (Complete)
- Amine Unit start-up and Operation
- SWS Unit start-up and Operation
- Air Compressors systems start-up and Operation
- Boilers and steam system start-up and Operation
- Desalination Unit start-up and Operation
- DM Water Unit start-up and Operation
- Stabilization unit start-up and Operation
- Caustic Wash units start-up and Operation
- Coordination of the start up team multifunctional and co-operatively
- Managing the activities of assigned staff
- Driving License
- Excellent written and verbal communication skills
- Capable of arrangement and delivering scope of work against deadlines
- LPG unit and storages start-up and Operation
- Operational / Technical trouble shooting
- Pre-commissioning and mechanical completion
- Commissioning of Gas Plant, Oil Refinery and Petrochemical plant
- Check list preparation and filling for required activities before start-up
- Preparation of Gas in requirements
- Preparation of Feed in requirements
- Preparation of Important requirements of shift working
- Start-Up requirements instruction for process units, utilities and flare
- Catalytic units preparation and start-up, regeneration
- Performance guarantee follow-up
- Process trouble shooting
- Control trouble shooting and
Familiar with API 650-620-520-526-682-676-2000./ IPS /ASTM /ASME