Quality control inspector- electrical
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
to be employed as quality control inspector - electrical utilizing my experience i the electrical field
Professional Experience
EMPLOYMENT RECORD
COMPANY : CONSOLIDATED CONTRACTORS COMPANY
Position : QC INSPECTOR, ELECTRICAL
Inclusive Date : June 12, 2007 to November 25, 2008
Project : Rabigh Olefin Plant Project
Location : Rabigh, Kingdom of Saudi Arabia
Implementation standard of inspection test plan (ITP) and quality control procedure (QCP) as per company agreement
Conduct inspection for installation such as:
1. Lighting, power, grounding & communication system layout
2. Panel board, local control station, transformers, electric motors and motor operated valve
3. Cable tray for lighting, power and communication system
Perform inspection for testing as follows:
1. Continuity test and insulation resistance test for lighting, power,
Communication cable and panel board
2. Continuity test, insulation resistance test and polarization index test for electric motors prior to energize.
3. Continuity test, insulation resistance test and oil dielectric strength test for transformer.
COMPANY : METRIX ELECTRODYNAMICS
Position : Electrical Service Engineer
Inclusive Date : March 2006 to May 2007
Implementation of standard practice such as:
A. EASA – Electrical Apparatus Service Association
B. NEC – National Electrical Code
C. IEEE- Institute of Electrical and Electronic Engineers
D. NETA – International Electrical Testing Association
Attend Technical meeting and perform plant site inspection for on-going project
Make scope of works and project schedule for quotation
Estimate Electrical project for bidding and on-going project materials requirement
Doing constant inspection of on-going project that need change during arises construction
Evaluation of project accomplishment and report directly to project manager
Supervised and initiate tool box meeting for on-going project
Coordinate project in-charge for lock out / tag out procedure prior commissioning such
as AC/DC Electric Motor /Generator/ Transformer
Perform commissioning (no load / full load) with project in-charge and submit test
result.
Make a project turn-over and acceptance certificate to the client
Eductation
EDUCATIONAL ATTAINTMENT
ATTENDED SCHOOL YEAR
Primary School Bugo Elementary School 1979
Secondary School Sacred Heart Academy 1983
College University of the Visayas 1988
Course Completed
Bachelor of Science in ELECTRICAL ENGINEERING
Professional Regulation Commission #0027425
Institute of Integrated Electrical Engineers of the Philippines, Inc. Life Members #14881
Board Exam Passer in Electrical Engineer, October 1988. All information above is true and correct.
Certification
SEMINARS ATTENDED:
JOB SAFETY ANALYSIS TRAINING
JGC ARABIA, Olefin Plant Project
Rabigh, Kingdom of Saudi Arabia
FIRST TECHNICAL SEMINAR & PLANT TOUR
Substation Equipment, Transformer & Maintenance
Underground Distribution System
Electrical Safety
Institute of Integrated Electrical Engineers of the Philippines Inc
MIDYEAR GENERAL MEMBERSHIP MEETING & TECHICAL SEMINAR
Predictive Maintenance Through Thermal Imaging
System Protection
Institute of Integrated Electrical Engineers of the Philippines Inc
AC ELECTRIC MOTOR REWINDING & MAINTENANCE
EASA standard (Electrical Apparatus Service Association)
HI-TEK Electro Mechanical Sales & Services, Inc.
Hot Categories
Chemicals
Batteries