Work Experience
Duration: From Jan 2009- Till Date
Company: ELCO International Engineering Co LLC, OMAN.
Designation: Welding Engineer
Project Handling:
Fabrication of Structural steel for Kauther Project – PDO
Fabrication and Erection of 500m3 DM Water Tank – Sohar Aluminium
Fabrication of Scraper/Launcher Receiver (8”X6”)- Rabab se Phase Development Project – PDO
Fabrication of Scraper/Launcher Receiver (20”X18” & 18”X16”) – Hubra Marmul Harweel Pipelines – PDO
Fabrication of Structural steel – UNISCO
Fabrication and Erection of Surge Tank – Marmul A Station Expansion Project – PDO
Project Handled:
Fabrication of Pipe supports - Qarn Alam Steam Project – PDO
Fabrication of Air Ducts – Qarn Alam Steam Project – PDO
Fabrication of Chemical Injection Skids – Qarn Alam Steam Project – PDO
Fabrication of Additional Platform – Qarn Alam Steam Project - PDO
Duration: From July 2008- Nov 2009
Company: Vijay Tanks & Company LLC, OMAN.
Designation: Welding Engineer.
Project Handling:
Hexane-1 Co-Monomer Feeding Facility for PE2 Project, ADPCL, AbuDhabi:
10.6m dia X 7.2m H Hexane Tank.
Qarn Alam Steam Generation Project, PDO:
72m dia X 15 m H Boiler Feed water Tank, 10m dia X 12m Filtered Water Tank,
15m dia X 14m H MMF Waste Tank, 27m dia X 15m H Raw Water Tank,
17.5m dia X 11m H Satellite wet oil surge Tank, 17.5m dia X 11m H wet oil surge Tank.
Al-Burg Project, PDO:
22.5m dia X 14.1m H 20m dia X12.9m H Free Water Knockout Tank (Double Wall Tank).
13m dia X 10m H Gas Floatation Tank.
Project Handled:
Lekhwair project, PDO:
27.5m dia X 11.5m H Crude oil surge dehydration tank
Duration: From Feb 2007-Apr 2008.
Company: GAMA AL MOUSHEGAH ARABIA LTD, Saudi Arabia.
Designation: WELDING ENGINEER.
Project: TASNEE Petrochemical Project (On Plot), Saudi Arabia.
Duration: From July 2006–Feb 2007 at
Company: Larsen & Toubro Ltd (ECC Division), Chennai.
Designation: SENIOR ENGINEER (QA/QC).
Project: RELIANCE Jamnagar Export Refinery Project, Jamnagar, Gujarat.
Duration: From April2006- June2006 at STERLITE Project, Tuticorin.
Duration: From July 2005- Mar 2006 at BPCL Project, Mumbai.
Company: Petron engineering construction ltd., Mumbai.
Designation: Engineer (QA/QC)
Eductation
M.E.(WELDING TECH), 2003-2005: With 75% from GOVT COLLEGE OF ENGINEERING (affiliated to ANNA UNIVERSITY), Salem, Tamilnadu
B.E. (Mechanical), 1997 – 2001: Graduated with 60.6% from P.S.N.A COLLEGE OF ENGNEERING (affiliated to Madurai Kamaraj University), Dindigul, Tamilnadu
HSC, 1997: Passes out with 75.8% from Z.K.M. Hr. Sec. School, Bodinayakanur, Tamilnadu
SSLC, 1995: Passes out with 85% from Z.K.M. Hr. Sec. School, Bodinayakanur, Tamilnadu
Certification
Industrial Exposure
• Organizational study at Salem Steel Plant, Salem (July 2004).
Certification
• ASNT Level II in RT, UT, PT, MPT.
Additional Information
Project Details
Duration: From November 2004-April 2005
Company: Welding Research Institute (WRI)-BHEL, Trichy
Project: Study on Welding of 9Chromium 1Molybdenum Steel using MIG
Welding Process
Duration: From January 2001-June 2001
Company: Welding Research Institute (WRI)-BHEL, Trichy
Project: Residual Stress Analysis in Submerged Arc Welded T-Joint
National Conferences
• A Paper Titled “Study on Welding of 9 Chromium 1 Molybdenum (Steel) using MIG welding process” has been presented in “Kongu Engineering College”, Erode. TN.