QA/QC Engg- M.Sc (Materials Science),CSWIP 3.1, AWS-CWI, ASNT LEVEL II(UT,RT,PT,MPT)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
• Preparation of WPS, PQR and WQT Records.
• Visual inspection of piping weld joints as per standard B31.3.
Professional Experience
COMPANY : ASSIA STEEL FACTORY COMPANY LIMITIED
P.O BOX 10372, JUBAIL INDUSTRIAL CITY. 31961
KINGDOM OF SAUDI ARABIA
POSITION : QA/QC Engineer/ Metallurgist
PROJECT : Approval of company by SAUDI ARAMCO and API.
Has appointed as a WELD ALLOY CLADDING DEPT. Metallurgist/Welding Engg. In QA/QC Dept. For getting approval for the company by Saudi Aramco and API.
COMPANY : PUNJ LLOYD LTD, GURGAON
POSITION : QA/QC Engineer
PERIOD : March 2009 to May 2010
PROJECT : BALANCE OF DELAYED COKING UNIT(DCU) & COKER LPG MEROX/IRUP PROJECT (EPCC-3A).
INDIAN OIL CORPORATION LIMITED GUJARAT REFINERY ,BARODA.
PERIOD : June 2008 to March 2009
PROJECT : M/s Punj Lloyd Limited for M/s Cairn India Energy Ltd. laying of
10” crude oil Pipeline in MDPL in spread Radhanpur Spur line
at Radhanpur, Crude oil piping station (AGI-13A, Radhanpur Terminal and IOCL Terminal) patan district, Gujarat (INDIA FIRST INSULATED PIPE LINE)
COMPANY : BIT INSPECTION TECHNOLOGY, CHENNAI
POSITION : NDT Inspector
PERIOD : May 2005 to June 2008
Project Trainee
Period: December 2007 – May 2008
Place: Defense Metallurgical Research Laboratory, DRDO, Hyderabad, India
Eductation
M.Sc (Materials Science)
Certification
CSWIP-3.1
AWS-CWI
ASNT LEVEL II (UT,RT,PT,MMPT)
Hot Categories
Chemicals
Batteries