A competent professional with more over 4 years of rich & comprehensive experience in Oil & Gas project. Talented and accomplished construction management professional in project mechanical supervision and mechanical engineering.
Professional Experience
Verification of Drawings as per survey.
Material/Equipment checking.
Material Identification of pipes, fittings, valves etc.
Piping & Pipeline Fabrication as per drawings.
Preparation of QA/QC & Final Documents & Records.
Preparation welding joint history sheet.
Coordinating with N.D.T Team and Third party Inspection Agency.
Installation, Hookup and Pre commissioning of Piping systems
Manpower Management. Documents Controlling
Knowledge of pipe laying
Evaluating progress of work at site with regards to planned jobs, Preparing DPR etc.
Drawing segregation, fit up & Visual Inspection of Weld Joints
Blasting , Painting & Coating Inspection.
Coating, Holiday Detection & Inspection.
Radiography Film & Dye Penetrant Test Interpretation.
Preparation of hydro test, Test Package.
Pigging & Hydro testing of Piping and Pipe line
Preparation of WPS , PQR & WPQT.
Pump Installation & Alignment.
Flow line Inspection as per standard.
Installation of Chemical Injection Skid & Metering Skid (Gas Separator).
Installation of Well Head Final Hook Up Spools
Preparation of WPS,PQR& WPQT and also quality control plans
Eductation
Diploma in Mechanical Engineering with Distinction from State Board Of Technical Education , Chennai (2006)
Plus Two with Second Class from State Board of Kerala (2003)
S.S.L.C with Second Class from State Board of Kerala (2001)
Certification
Auto-CAD 2005.
ASNT LEVEL II (UT, RT, MT, PT).
C.N.C Milling & Lathe Programming Setting & Operating
Additional Information
PROJECT HANDLED:
CLIENT : GREATER NILE PETROLIUM OPERATING Co. (GNPOC).
PROJECT : 1) FIELD SURFACE FACILITY PHASE 4 PROJECT (FSF4 )
Well Head Hook up Facilities, Flow lines &
Oil Gathering Manifold (OGM).EPCC PROJECTS.
2) IMPLEMENTATION OF BIO-REMEDIATION PROJECT.
Above Ground 20" Dual Pipeline & Pump Station.
CLIENT : RELIANCE ENGINEERING ASSOCIATION LTD (REAL).
PROJECT : 1) RELIANCE EAST WEST GAS PIPELINE PROJECT (EWGPL)
Compressor Station 10A/10B,A/G & U/G Piping,
Structure, Equipments, Skids & Heat Exchanger Installation.
2) PLANT DISMANTLING . (NOCIL)
Pumps, Vessels, IBR Lines, Furnace, Chimney, Columns
CLIENT : AUDCO VALVES INDIA LTD.
TYCO VALVES INDIA LTD.
LUCAS TVS INDIA LTD.
Manufacturing of Valve & Automobile Components