QA/QC Engineer -welding,piping,NDT,ISO9001:2008 lead auditor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To work with an organization which can utilize my skills and abilities and provides opportunities for development of my technical skills and growth along with the organization
Professional Experience
1 Experience in inspection of material, equipments, piping, welding and mechanical activities. 2 Familiar with isometric drawings and P&IDs. 3 Interpretation of Radiography test results. 4 Conduct PT,MPT,UT and interpret results. 5 Monitor PMI & PWHT activities and review reports. 6 Conduct hydro and pneumatic test of pipe lines. 7 Preparation of test packages and completion of QA/QC Dossiers at project completion time. 8 Interaction with concerned departments and disciplines for day to day activities. 9 Directly reporting to the QA/QC Manager regarding the work progress and daily activities.
Eductation
„« B Tech in Mechanical Engineering - University of Calicut
„« Pre-Degree with Maths, Physics and Chemistry - University of Calicut
„« 10th (THSLC in MOTOR MECHANIC) from Govt: Technical High School , Manjeri with First class(Dept: of Technical Education ,Kerala)
Certification
„« QUALITY MANAGEMENT SYSTEMS (EN ISO 9001:2008 )
Lead Auditor Training Course ( 26thApril -30th April 2010 ) Passed;
Delivered by BSI Training ; Certificate No: QMS041-1018-0129
„« CSWIP 3.1 (CERTIFIED WELDING INSPECTOR) ; Certificate No: 42131
(from October 2009)
„« AWS-CWI (CERTIFIED WELDING INSPECTOR);
Certificate No: 09075191 (from July 2009)
„« ASNT /NDT LEVEL ¡VII in the following (from April 2007)
1) Magnetic Particle Testing
2) Radiography Testing
3) Penetrant Testing
4) Ultrasonic Testing
Additional Information
About five years of experience as Quality Control Engineer in esteemed organizations. Quality control confirming the international standards for welding, piping materials, fabrication, NDT inspection ( RT,UT,PT,MPT),Inspection of pressure vessels during plant shutdown, Hydro test inspection, Pneumatic test inspection, Positive material identification (PMI), Post weld heat treatment (PWHT) and Erection of pipe lines related to various petrochemical and Oil refineries projects.
Hot Categories
Chemicals
Batteries