Egypt Zones accountACCOUNT

Sulfur Recovery and Tail Gas treatign Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 9 years
Relocation: Yes - Internationally

Industry Experience
3 years Chemical Engineer
3 years Plant Engineer

Career Objective

• Quest to work in a real professional environment that enables to cope-up with the emerging latest technology and scope to improve the knowledge

Professional Experience

Steady State Operations (At present):
Working as a Shift Engineer in Sulfur Recovery & Tail Gas Treating Unit.
• Co-ordinate the maintenance jobs with service departments in the shift with complete Work Permit compliance.
• Controlling the activities during the plant emergencies, start-up and shut down by co-ordination of field and panel operators.
• Ensuring Standard Operating Procedures are being followed during the shift for routine operation of all major equipments.
• Major Equipments : Claus Air Blower, Reaction Furnace , Claus and CBA reactors, HP and LP steam generators, Steam Eductors, Incinerators, Absorber , Regenerator, Pumps, Fin Fans.

Health, Safety and Environment

• Carry out safety observation for routine maintenance and operation activities to promote safety culture.
• Total compliance of Permit to Work system through SAP and its application for various types of permits as cold work, Line break, hot work & confined space.
• Well versed with of Process Safety Management and its tools such as Process Hazard Analysis (PHA), Management of Change (MOC), Emergency Response and Control Procedure (ERCP), Pre/Post Start up Safety Review (PSSR).

Project Stage

• Review of Project documents for Sulfur Recovery Unit & Tail gas Treating Unit (BVPI, Bechtel)
• Review of P&IDs, Isometric drawings, GA drawings.
• Reviewing/ suggesting for piping modification (through SERs).
• Review of Underground systems and Aboveground Piping and Interconnectivity
• Preparation of Operation Manuals, Standard Operating Procedures, Start up Procedures, Emergency Procedures and their subsequent revision after Plant commissioning

Pre-commissioning Stage

• Preparation of Flushing plans like Chemical Cleaning, Steam Blowing, Rotomole Flushing, and Cardboard Blasting.
• Steam Blowing (a cleaning process for Steam piping) document/ procedure prepared and coordinated steam blowing.
• Burner Management System (BMS) for Claus Reaction Furnace and Incinerator. Logic checking for Cold Bed Adsorption Cycle (CBA cycle), Eductor system and Tail Gas Diversion Valves.
• Logic checking with vendor for Claus Air Blower as per cause and effect diagram.

Eductation

Bachelor Of Technology ( Chemical Engineering )
1995 - 1999 , Percentage Obtained : 69.13 %
University Department of Chemical Technology,
North Maharashtra University , Jalgaon

Higher Secondary Certificate Exam
1994 - 1995, Percentage Obtained : 81.6 %
Jai Hind Jr. College , Dhule
Divisional Board , Nashik

Secondary School Certificate Exam
1992 -1993 , Percentage Obtained : 83.16 %
Mahatma Fule Vidyalaya, Shirpur
Divisional Board, Pune

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.