Instrumentation Planning Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Seeking assignments in Detailed Instrumentation & Control Engineering with a progressive EPC organization.
Professional Experience
Feb.2010-Present Arabian Fal Company For Contracting and Trading
Arabian Fal Company
Instrumentation Engineer with Arabian Fal Company as a contractor employee of Saudi Aramco (Arabian American Oil Company) from Feb.2010 to till date.In basics of Time Unit Rate,Arabian Fal Company Suply me Saudi Arabian American Oil Company as an Instrumentation Engineer (Maintenance / Planning).
Reporting to Saudi Aramco Superintendant,I am responsible for
• Design DCS,PLC/SCADA,I/O Lists.
• DCS,PLC Programming and SCADA System development.
• Perform Instrumentation and Control Cables Voltage drop calculations.
• Prepare Data Sheets for approval.
• Conduct instrumentation selection.
• Design Loop diagrams.
• Develop instrumentation index.
• Develop Cable rooting,Logic diagram panel design.
• Review Supplier details.
• Comment and issue submittals for consultants approval.
• Developping instrumentation plot plan and connection details.
• Performing instrumentation (instruments) calibration.
Oct.2006-Nov.2009 DIGICON,A System integrator of invensys EUROTHERM
Instrumentation Engineer
DIGICON
This company is system integrator of invensys EUROTHERM And this is active in distribution and sales of all about heat Treatment Products of EUROTHERM like PID Controllers,Indicators,Alarms Units,Recoders And Data Management,Drives,DCS,E Power Controller,Thyristers and I/O Signal conditioning units
Reporting to kolkata sales manager and being part of a team of 5 technical Represent- atives ,I am responsible for
• Maintenance ,Testing ,Commissning and installing all the products in on site and off site.
• Loop Testing and Checking accuracy for getting the desired output.
• Setting and developing stratagies and objectives.
• Monitoring and analyzing market trends.
• Using a range of tools and techniques to motivate the other staff.
My main achievement in this job includes
• Increased satisfaction by 80%on 2009 compared with 2007 and 2008.
• Customers satisfaction:Achieved zero unsolved customers complain over past 3years.
Eductation
June2004- june2008 Batchelor of technology (B.Tech) Kolkata,India
(Engineering in applied electronics & Instrumentation)
77.8%,W.B.U.T
June2001-June2003 Higher Secondary (H.S) Kolkata,India
55.5%,W.B.H.S.E
June1991-June2001
Matriculation Bihar,India
73.3%,B.S.E.B.P
Certification
2007 Industrial training from steel Alloy Steel Plant Durgapur,India
Authority of india limited(SAIL)
2007 Multiline voltage,current & Freq. Projects offered by W.B.U.T,India
Monitoring & Implimentation using 8085micr.
2008 Merit-cum-Means Scholarship West Bengal Minorities Develop-
ment Fund Corporation of India
Additional Information
Non-web programming languages
• Micro Processor and micro controllers
• Industrial Instrumentation
• Analogue Electronics
• Process Control System
• Digital Electronics and Circuit Design
• Control System
• Transducer and Sensor Elements
Operating Systems, Networking & Hardware
• C Language
• Data Structure
• Computer Networking and Internet Systems
• Computer Graphics
• Multimedia and Computer Animation
Hot Categories
Chemicals
Batteries