Production Operator
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Seeking a challenging position as a Plant/Panel Operator in a dynamic and rapidly growing organization
Professional Experience
Technical Experience:
08 years
Present Job:
MOL Pakistan Oil & Gas Co. B.V, Karak, Pakistan
Presently I am working as a PRODUCTION OPERATOR (Panel operator) at Manzalai Central Processing Facilities Plant from Aug, 2009 to Till Date.
PLANT DESCRIPTION
I have participated in the Errection, and Commissioning activities of Manzali Gas Central Processing Facilities have 02 Gas processing trains of 300MMscfd & Condensate Stablization of 6000BPD with following features;
Operating System, DCS Yokogawa centum 3000
Communication of Wells instrumentation through SCADA
Gas manifolds and gathering stations
Three Phase Separator (Slug Catcher)
TEG Dehydration
HCDP (Hydrocarbon Dew point Control Unit) with JT Valve
Sale Gas & Flash Gas Booster PD Compressor Unit
Condensate Stabilization Unit
Condensate Storage Tank
Condensate Loading Area
Close Drain system
Heat Medium (Hot oil) System
Nitrogen Generation Unit (PSA)
Responsibilities:
Start up /Shut down / Trouble shooting /Emergency handling of plant.
Monitoring, Controlling & Trouble Shooting of Well
Process optimization
Coordination with operational staff about plant operation job handing over/ taking over
Verification of DCS parameter with local instrumentation
Manage Condensate storage Tanks
To check, log and control plant parameters.
Reporting Plant status or any abnormalities to Shift In-charge
Participates in all maintenance and inspection activities.
Prepares equipment for required job and place back on line upon completion. Includes de pressurizing/pressurizing, purging, isolating and releasing/ receiving equipment.
Follow standard safety procedure, work order & work permit policies
Previous Jobs
1- Oil & Gas Development company Ltd.
I have worked as a DCS operator at Uch Gas processing plant of OGDCL having capacity is 300 MMSCFD with control system is D.C.S BAILEY INFI-90 Canada in Dera Bugti Pakistan from 2005 to 2009.
.
2-Attock Refinery Limited, Rawalpindi, Pakistan
I have worked as Plant Operator on Naphtha Hydro treating & Catalytic Reformer Unit with capacity of 8000BPD from 2002 to 2004
Eductation
Qualification:
Secondary School Certificate (Matric ) in year, 1999
Three (03) years Diploma of Associate Engineering in Chemical Technology from Peshawar board in year, 2002
Bachelor of Arts from Peshawar University in year, 2006(Private)
Master of Arts from Peshawar University in year,2009(Private)
Certification
Professional Training:
One year training from PRTI (OGDCL) Islamabad, during this period on job training at following Plants from 2004 to 2005
LPG Recovery Unit at Dakhni plant.
NGL Stabilization Unit at Dakhni plant.
Sulphur recovery unit at Dakhni plant.
Cryogenic Process (Turbo expander) at Dhodak plant.
Amine Gas sweetening unit at Dakhni plant
Kunner LPG Plant.
Courses:
Introduction to Petroleum Industry
Gas Dehydration
Production Operation
Computer Training
HSE and Fire Fighting Training.
Works permit Procedures.
H2S alive
Corrosion causes & its controls
Special Achievements:
Commissioning Of Manazali CPF (Central Processing Facilities) Plant
Attended the Regeneration and loading/unloading of Reformer Catalyst (R-56 UOP)
Additional Information
Computer Skills:
MS Word
MS Excel
Internet Browsing
Extra-Circular Activities:
Playing Cricket and Badminton
Listening Music
Language:
Fluent in English
Urdu
Pashto
Current Salary 1000$(US)
Expected Salary 3000$(US)
Reference
Kashif Alam Khan (Shift-Incharge)
+92-300-5773050, +92-333-9293979
Muhammad Farooq (Production Operator)
+92-300-9013969
Hot Categories
Chemicals
Batteries