tariq (CV)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
To impact the best of my potentials in the Maintenance of Process industry or construction projects.
Professional Experience
At present working with BYCO Petroleum Pakistan formal BOSICOR REFINERY as Assistant Manager Mechanical since Sep, 2002 and responsible for the maintenance of equipment.
ZISHAN ENGINEERS Jan. 2001 t0 Aug 2002
Worked with as Sr. Engineer on the following projects with Zishan Engineers
1: Worked for Bocicor Refinery as Rehabilitation coordinator, during the service inspected and supervised the over hauling of more than 100 pumps of different types and 64 heat exchangers. Also prepare the inspection and damage reports of the above mentioned equipments.
2: Worked with Gas Link Nigeria Limited since 18th Aug 2001 as Head of Technical Service and responsible for operation and maintenance of PRMS and other facilities for gas distribution system. Also provide the technical support to Gas link's consumers.
ZELIN private Ltd. Jan95 to Dec 99
Work with Zelin (Private)Ltd. as site Manger/Senior Engineer from Jan 95 to Dec 99 on the following project.
As senior Mechanical Engineer at 117 MW Power Project for Southern Electric Power Company Limited at Raiwind performed installation and commissioning of the portable water system, Decanting System, Sewage Water System, Drain Water system, Water Neutralization System, Steam and Condensate System, Storage tanks, Auxiliary Boiler.
As senior engineer at 125 MW Power Project for Kohinoor energy at Raiwind performed installation and commissioning of steam and condensate System, Circulation Water System, Fuel decanting System and storage tanks.
As senior engineer supervise the installation of insulated Bus bars at HUBCO Power.
As Site Manager Refurbished the Boiler of 200 MW, WAPDA Power station at Guddu.
As senior Engineer supervised the installation of system such as cooling water, Fuel oil, Decanting and air system at 115 MW Power house for lucky power at D.I.KHAN
As Site Manager Completed the Engine Test Cell Project for Commence Engines at Bin-Qasim.
Gibbs & Hill Inc. Engineering Consultants,(U.S.A) 1987 to 1993.
Petromin Refinery Riyadh (Saudi Arabia) 1981 to 1986
.
Also work as coach to train the Saudi apprentices.
National RefineryLtd. 1977 to 1981
Eductation
F.SC Is lamia Sc. Collage Karachi 2nd Division 1972
D.A.E (POWER) Govt. Collage of Technology 1st Division 1976
B.A (Economics) Karachi University 2nd Division 1981
Certification
Having original certificate attested by ministry of foreign affairs.
Hot Categories
Chemicals
Batteries