Egypt Zones accountACCOUNT

Planner / Scheduler


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 16 years
Relocation: Yes - Internationally

Industry Experience
16 years Engineering

Career Objective

To explore a challenging position that would enhance my skills and knowledge in partnership with a company’s vision and mission To promote professionalism within an organization through acquired skills

Professional Experience

Position: SENIOR PLANNING ENGINEER
SHELL PEARL GTL PROJECT (2008 to present)
C8 Project- Effluent Treatment Plant
O2 Pearl / SPIE Oil & Gas
Saipem and Veolia Joint Venture, Qatar
Project:
• Construction of Effluent Treatment Plant for Pearl GTL Project – Drainage Collection / Primary treatment, 2 trains ETP Plant, and Cooling Water Blow down ERU package.

Position: SCHEDULING ENGINEER
SAUDI ARAMCO (2005-2008)
Saudi Arabian Oil Company, KSA
CTS-Research Sciences Arabia Ltd (RSAL)
Project:
• Khursaniyah GOSP & Gas Plant Aramco Mega Project design to process 500,000 bpd of Crude Oil and 1 billion Std. cubic feet per day of associated Gas and Gas Plant output of 280,000 bpd of Condensate Gas.
Assignments:
• Producing Facilities (Gas and Oil Separation Plant). Oil & Water Wells, Flow/Trunk lines, Interface Manifolds and Facilities (Maintain Potential). Upstream & Downstream Pipelines, Scrapers and Facilities. AFK 115kV Switchyards. Permanent Communication Project

Position: PROJECT / PLANNING ENGINEER
YANBU STEEL CO. (2000-2005)
Formerly PDM Saudi Arabia, KSA
Engineering, Design & Heavy Steel Construction

Position: ERECTION SUPERVISOR
CENTURY IRON WORKS (1999-2000)
Heavy Steel Construction
Philippines



Position: PLANNING TECHNICAL SUPERVISOR
ABV ROCK GROUP KB (1991-1999)
Tunneling, Engineering, Design & Heavy Steel Construction
Saudi Arabia


Position: TECHNICAL SUPERVISOR
JUBAIL ALUMINUM FACTORY (1985-1991)
Aluminum Fabrication
Saudi Arabia

Position: CHARGEHAND FABRICATION / ERECTION
TAY SENG MANUFACTURING INC. (1979-1985)
Steel Manufacturing Co.
Philippines

Position: PRODUCTION CONTROL STAFF
HERCULES METAL PRODUCTS INC. (1977-1979)
Heavy Steel Fabrication, Philippines

Eductation

Structural Engineering
• Course Completed - 2004
(Thomson Education Direct)

Bachelor of Science in Mechanical Engineering
• 1977-1980
(Central Colleges of the Philippines)

Bachelor of Science in Mechanical Engineering
• 1976-1977
(Leyte Institute of Technology)

Certification

• Primavera Project Planner (P3)
• Accounting for Non-Accountants
• Insights on Project Feasibility Studies
• Management by Results
• Workers Welfare and Protection
• Information of Standards Technical Specs and Procedures - Welding Requirements & NDT
• First Aid Safety Training & Fire Fighting Course
• Stick Electrodes & Tungsten Inert Gas Welding

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.