Experienced chemical engineer with HSE risk management background
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
Looking for a challenging job that can utilise my technical and managerial skills while providing me an opportunity to develop
Professional Experience
•Det Norske Veritas AS June, 08 to present
Role: Consultant for Risk Management solutions in Energy Sector (HSE Risk Management and Verification)
Projects:
1.TATA Steel Limited- QRA for I-Blast furnace area
2.Tractebel Engineering-For Gas Authority of India Limited: QRA for Dispatch terminal station
3.L&T-ONGC MHN-QRA for N14, 17, 18 & 20 platforms
Additional Scope of this project was to carry out Fire and Explosion analysis, Gas and Smoke Dispersion analysis
4.Vopak Terminals Singapore Pte Ltd.-QRA for Floating storage vessel
This project involved assessing the safety implications of using a ship as a temporary storage vessel
5.Kavin Engineering, Malaysia-Vent gas dispersion study for B-178A, B-23A NUIs
Estimation of risk due to hydrocarbons during venting is the main deliverable for this project
6.Rashtriya Ispat Nigam Limited-Safety study
The purpose of this study is to assess the risk and provide solutions to reduce the accidents in the steel plant’s Coke oven & Coal Chemicals plant
7.Hindustan Petroleum Corporation Ltd.-Quantitative Risk Assessment and Disaster Management plan preparation for Suryapet Terminal
8.Takreer pipeline (Abudhabi)- Quantitative Risk Assessment of the pipeline near housing project
The objective of the project was to assess the risk to a proposed housing development due to an underground pipeline transporting Petroleum products
9.Essar India Ltd-QRA
The purpose of this study was to carry out a Quantitative Risk Assessment for Essar India’s Salaya & Vadinar Jetties in concept stage
10.Cairn Energy IndiaLtd.-QRA for Mangala Process terminal
11.Punj Lloyd-Quantitative Risk Assessment for Offshore platform-Western offshore, India
This project involved assessment of additional risk after installing a flange instead of a weld-joint near the riser-subsea pipeline tie-in location at the sea-bed
12.Linde FLNG FPSO- Offshore QRA
13.ONGC Onshore Odalarevu Process facility-QRA
14. Conducted training in topics like Risk Assessment, DNV’s PHAST and PHASTRisk, Advanced Dispersion and Flammable modeling for organizations like Petronas Malaysia, Petrofac Engineering, TATA Steel
•Confederation of Indian Industry (CII) June to October, 07
Role: Energy auditor
Projects:
1.Hindusthan Newsprint Limited-Energy Audit
2.Zuari Fertilizers-Energy Audit
3.Kesoram Cements-Energy Audit
Eductation
Course: Bachelors in Technology in Chemical Engineering from Osmania University with an aggregate of 77% (First Division)
Pre-university:
Board of Intermediate Education: Scored 93.3%
Schooling:
Secured Secondary School Certificate (Andhra Pradesh State Board)
Aggregate: 82.33%
Hot Categories
Chemicals
Batteries