19 years Welder/Fitter
10 years Field Engineer
8 years Quality Control/Quality Assurance Engineer

Career Objective

Working very hard, with passion, with clear goals and objectives well defined, applying my dedication, sense of belonging, teamwork, planning, responsibility, honesty, among others.

Professional Experience

TERMINALS MARACAIBO, C.A.
Sep 2008 - Jan. 2009
Welding Supervisor

PRIDE FORARMER
Feb. 2003 - May. 2003/Jan. 2004 - Aug. 2004
Welding Sup

MAERSK DRILLING.
Jun. 2005 - Oct. 2006
Welder I
C.B.I.
Jan. 2002 - Dec. 2002
Welding Sup
Project: BOUNCER
INELECTRA / oppo / SINCOR
http://www.cbi.com

C.B.I.
Jul. 2001 - December 2001
Welding Sup
Project: 4100 AREA 11 TANKS

Automatic Welding Sup
Project: Construction of 27 tanks Ameriven different floating roof tanks 225'diam 5, 4 floating roof tanks of 190 type 5 'diam., 1 tank dome 120' diam., 2 floating tank 85 'diam., 6 conical tank 40 'diam,
1 tank open 85 'diam, 4 tanks Weth master 120' diam 4 conical tanks 65 'diam.
Client: Consortium ALVIC-Ameriven

C.B.I.
Jun. 1999-Jun.2001
Welding Sup
Project: 8200 Area 16 tanks DDFRT and construction of 4 tanks Taejo Double Deck Floating 220 'DIA. And construction of the Interconnection include: foundations, piping, installation of multiplex.
Customer: PDVSA

C.B.I.
December 1998-May. 1999
Welding Sup
Project: Stop Plant
Amuay refinery
Customer: PDVSA

C.B.I. L.T.D. HOUSTON
Mar. 1998 - Nov. 1998
Welding Sup
Project: Dam penstock for Uribante-CAPARO (PRECOWAY)
http://www.cbi.com

C.B.I.
Nov. 1997 - Mar. 1998
Welding Sup
Project: FLEXICRAKER (LAGOVEN, SA Refinery Amuay)
Stop Plant (Repair of reactors, generators, Torres fractional Exchangers, Drums and Pipes)

C.B.I.
May. 1997 - Aug. 1997
Welding Sup
Project: Butane (CORPOVEN, Inc.)
Low Temperature Cryogenic tank dome.

C.B.I.
Mar. 1996 - December 1996
Welding Sup
Project: CONSTRUCTION OF 2 TANKS OF 250 MBLS, Puerto La Cruz Refinery (CORPOVEN SA)
C.B.I.
Dec. 1995 - Feb. 1996
Welding Foreman
Project: Repair Stationary Low Temperature Tanks. (MARAVEN, SA) Ciudad Ojeda Zulia State.

CBI, S.A
Jul.1994-Nov. 1995
Welding Foreman
Project: Construction of two cryogenic steel tanks (oxygen and nitrogen)Conversion of Tank for washing, cyclones and pipes (LAGOVEN, SA)

Client: PRAIXAR. Caribbean Plant

LAMAR CONSORTIUM, CA
1992-1994
Superintendent in different services:
Hydraulic Wrenches, computed torques, hiring labor, operators of hydraulic equipment
Maraven/Lagoven

LAMAR CONSORTIUM, CA
1983-1991
Welder/Operator Hydraulic keys

ZEROKENT
1980-1982
Resident Welder Mechanical Metal Works: pipelines.

Eductation

Higher Education: Alonso de Ojeda University
Location: Ojeda City, . Zulia State, Vzla.
Title to Choose: Industrial Engineer
Secondary Education: Liceo Nocturno Ojeda "
Location: Zulia, Vzla.

Title: Bachelor of Science

Certification

Competency Certification Module C. 2007.

Confined Space Training. November 2004.

Swimming Certificate. Maracaibo July 7, 2003.

Trained as a Welding Supervisor (Lead-man) in the construction of oil storage tanks by the Chicago Bridge and Iron (CBI Venezuela): 2005-1984.

Trained as Key Hydraulic Operator by Lamar Consortium 1984-1980.

1st Welder Certified by the Center for Integrated Education and Development society (PDVSA, the West (2001)

Inspector Visual and quality control in welding (Leal Technical Advisers: 2,002)

Universal soldering iron shaped like the Siderurgica del Orinoco (Sidor) and Inapet

Welding Supervisor and Quality Control (CB&I: 1,999)

Mobile Crane Safety (CBI 1,997)

Outher Welding Shield Wire: OS: 71 M: (Lincolhn Electric Company: 1,997)

Accident Prevention Program for Supervisors (CBI 1,997)

Additional Information

Abstract:

Multidisciplinary Supervisor certified by PDVSA (venezuelan state oil company): Module C for Executory Process Management Mechanical Works: Installation and welding of structures of metal containers for serving the Petroleum Industry: Cooling Towers, Tanks dome, floating roof, double conical roof open spheres, low temperature tanks, rotating equipment, piping, valves, multiplex, reactors, exchangers, gasifiers, heat exchangers.


Coordinate logistics and run repair plant shutdowns in refineries, tank repair at several plants in the petroleum industry and metal construction of various mechanical structures.


Supervision and Inspection of Civil Works: Foundations for tanks in its different types: (Spheres, Floating Roof, Tapered, low temperature, among others.) For rotating equipment.


Multidisciplinary Personnel Management


Expertise:

TECHNICAL SKILLS

Industrial Engineer, with experience in engineering projects and multidisciplinary coordination.

Universal welder, certified by venezuelan state oil company PDVSA and CHICAGO BRIDGE & IRON, with high knowledge of rules and procedures: COVENIN, PDVSA, ACI, ANSI, API, ASTM, SSPC, NACE, Allower, Planning and Project Control. Application of the Rules of Hygiene, Environmental and Industrial Safety.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Contracting Services » News » Dredging » News » Electrical » News » Mechanical » News » Pipe Lines Installations » News » Steel Works » News » Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.