Production Manager (September 2008 up to present) INGASCO, INCORPORATED (Joint venture with Taiyo Nippon Sanso, Japan), San Jose, Batangas Line o
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
To have a challenging job in the field of gas industry where my acquired skills, years of experience and academic training and abilities can be used to excel in this dynamic and fast paced highly developed industries.
Professional Experience
• Manage/direct the whole operation of ASP PLANT, NLP PLANT, CO2 PLANT AND R.O. PLANT at INGASCO PLANT San Jose, Batangas.
• Manage/direct the whole operation of Asp Plant, Hydrogen Plant and R.O. Plant at TNSPI Tanauan, Batangas.
• Develops maintenance priorities plans and programs, including budget duration of jobs, specifications, assignment of manpower and timetable activities.
• Develops and implement preventive maintenance programs for all plant machineries and equipment.
• Exercise administrative control over all personnel under his control.
• Conduct studies and make recommendations on plans for plant machinery upgrading.
• Ensure implementation of preventive and corrective maintenance programs and that proper plant operation and maintenance programs were done effeciently and effectively.
Position: Shift Supervisor (July 2006-September 2008)(INGASCO,INC.)
JOB DESCRIPTION:
1. Supervise the operation of Air Separation Plant (MMG 15500) including CO2 Plant, ensuring that all equipment are in normal operating condition.
2. Regularly evaluates operation data and immediately implements corrections if abnormalities detected.
3. Prepares daily and monthly Production Report
4. Monitor plant efficiency and make necessary corrections or adjustment if it falls below the target.
5. Directly handles twelve process operators, thereby, ensuring that all work activities conform company standard and safety practices.
Position: Senior Process Operator (April 2002-July 2006)(INGASCO,INC.)
JOB DSCRIPTION:
1. Responsible for the overall operation of Air Separation Plant (MMG 15500) including start-up and shutdown.
2. Prepares Daily Production Report.
3. Monitors development and abnormalities in plant operation and makes necessary adjustment and correction when possible.
4. Perform periodic routine check of all equipments.
5. Prepare job request order as needed if machine and equipment have defects.
6. Trains assistant process operators in DCS operation.
7. Monitor cooling water system and feeding of chemicals.
Position: Assistant Process Operator (January 2001-April 2002)
JOB DESCRIPTION:
1. Responsible for local operation of Air Separation and its auxiliaries including cooling water system.
2. Monitors storage tank level and pressure.
3. Assist senior process operator in start-up and plant shutdown.
Eductation
• Graduated Bachelor of Science in Mechanical Engineering (1983-1988) from Leyte Institute of Technology, Tacloban City
• Licensed Mechanical Engineer
• Computer literate, MS Word, MS Excel, Internet
Certification
• Industrial Electrician, Meralco Foundation Institute, August 1994
• Chemical Safety Seminar, INGASCO, INC., October 2006
• Calibration training for process instruments: Pressure gauges, Analog and Hart Transmitter, and control valves by Trigon Management and Industrial Corporation
Additional Information
Date of Birth: August 7, 1966
Religion: Catholic
Nationality: Filipino
Civil Status: Married
Height: 5’5”
Weight: 63 kg
Hobbies: Reading, Playing Computer
Hot Categories
Chemicals
Batteries