field operator gas and oil
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 20 years
Relocation: Yes - Domestically
Career Objective
A hardworking and highly competent superior technician with Process Control experience in the Oil & Gas and Petrochemical Industry, who was developed:
• Inspection, operation and maintenance skills
• Quality control talents
Professional Experience
1983, sept-to 2002
PROCESS POLYVALENT OPERATOR AT SONATRACH COMPANY GAS TREATMENT PLANT
Sonatrach Direction Production Alrar, ALGERIA
20,000,000 S/CUBIC/M/D Crude Separation & traitement gas
Product: 5200 Cubic/M/D Condensat, 24,0 Millions S/Cubic/M/D Gas, 3900 Cubic/M/D LPG.
04 trains separation of raw gas with a capacity of 10 Cubic / M / Day, a unit of propane for cooling in each train and another unit of gas compression in each train, a compression zone gas destined for the injection and gas sales, another area for the separation of LPG (Propane / Butane) who intended to sell. Another area for the storage of condensate consisting of 03 floating tray specified for condensate and a conical tank for condensate unspecified, also 03 spheres for LPG storage sphere specified and 01 unspecified for LPG and 02 cigars for storage of propane and 02 other cigars for the storage of butane.
2002, June-to 2008
CONTROL ROOM BOARD OPERATOR
ORGANISATION OURHOUD, ALGERIA
300,000 B/D Crude Separation Plant
2008, November to present
Foreman section gaz
ORGANISATION OURHOUD, ALGERIA
Type of Plant: Central Plant Facility (which consist of 46 crude oil wells, 36 lift gas wells, 05injection gas wells, 33 water injection wells,three trains of separation, desalination and stabilisation of crude and associated gases comprimation in five stages, water treatements: Oily Water Treatement and Albian Barremian Water Treatement; Air Compressors, Inert Gas Package, Potable Water Treatement)
System used in CCR-Yokogawa Centum 3000, witch consisted of: DCS, Fire and Gas System , ESD and PSD Diagrams.
Gases comprimation is made with compressors Nuovo Pignione and after dehydration step is used one Booster Gas Lift Compressor (a compressor in two stages actuated by a Gas Turbine).
Transffered from JGC to Organisation Ourhoud following succesful handover of the project to operate the 300,000B/D Crude Separation Plant.
Application of the modern tools, especially computer based, to achieve optimum plant performance.
Technical writer ( SOP, EOP )
Normal operation activity.
Eductation
STUDY: Technician Process gas and oil in , Oil & Gas Institute of Algerian Petroleum institute of Oil & Gas Processing (I.A.P), 1982 -1983
: Superior Technician Process gas and oil in,Oil & Gas Institute of Algerian Petroleum Institute of Oil & Gas Processing (NAFTOGAS), 1994 -1996
: Customer Training: GE Power Systems Oils and Gas Florence Learning Center Italy
- Course on PLC GE FANUC 90/30
- Speedtronic Mark V
: Customer Training: group IPEDEX France
- Common Course on the job training - Simulator proceed Centum CS 3000
-First aid
LANGUAGES: Arabic,French, and average English.
ABILITIES: Computers skills ( Word, Excell ), ICS Yokogawa Centum 3000
Hot Categories
Chemicals
Batteries