Egypt Zones accountACCOUNT

Project Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 6 years
Relocation: Yes - Internationally

Industry Experience
5 years Project Engineer
5 years Engineering Management
5 years Engineering

Career Objective

Team player. Highly analytical, creative and innovative. Personal drive, technical know-how, commercial and schedules awareness, and have the ability to multi-task within cross functional environment for the benefit of my employer and client.

Professional Experience

Foster Wheeler Energy Ltd
Project Engineer (Ras Tanura Integrated Project) [2010 - Date]

• Report and assist the Utility, Power and Infrastructure (UPI) Engineering Manager, who maintains, controls and is responsible for the entire engineering (Process, Civil, Piping, Mechanical Equipment, Electrical, and Control & Instrumentation) operation and performance on the project.
• Coordinate workshare between REC and IEC by assisting and expediting discipline needs as input to achieve or exceed expected output.
• Administer the change procedure, reviewing and collating all information received on disciplines returns.
• Responsible for the processing of Decision Records (DRs) and maintaining the DR register for any deviation from the contractually agreed project Scope, Schedule or Cost.
• Prepare estimates of change impact assessment on Decision Records; identify and notify all groups potentially affected by any change.
• Participate in P&ID review for seawater intake and desalination units. Coordinate, respond and close technical/ non- technical queries in the tracker resulting from P&ID reviews.

Project Engineer - Interface Management Team (Ras Tanura Integrated Project) [2009 - 2010]

• Assist FEED contractors in understanding all aspects of interface management tools and procedures, and provide on-going support.
• Develop and prepared total Interface Queries (IQs) and Interface Points (IPs) reports, and monthly stage progress reports for Client and Foster Wheeler project management teams.

Project Engineer - site (Petronas PSR2 Refinery Revamp Project) [2009]

Assistant Lead Piping Engineer –site office (Petronas PSR2 Revamp Project) [2008 - 2009]


Piping Engineer (Woodside Pluto LNG Project) [2007 – 2008]

Eltron Chromalox UK Ltd

Special Applications Process Design and Proposal Engineer [2006 – 2007]


Luberri S.L. Installation Site Supervisor [2000 – 2003]

Ministry of Power and Steel [1999 – 2000]

Eductation

Kingston University UK
Mechanical Engineering (Hons) B.Eng

Auchi Polytechnic
Mechanical Engineering OND

Certification

Microstation 2D modelling, Plant Design Systems (PDS) 3D modelling, Smart Plant Review (SPR), Projectwise, CAESAR II package for piping systems stress analysis, MTASC for oil and gas process analysis, Pert-master and Microsoft project management software, AutoCAD 2006, and Microsoft access, word, excel and power point, and Visual Basic 6.0.

Professional Organisation:
• Associate Member Institute of Mechanical Engineers (AMIMechE) – presently in my 4th year – 4th quarter MPDS en-route to CEng.
• Member Project Management Institute (PMI)

Additional Information

I obtained a degree in Mechanical Engineering, and an Associate Member of the IMechE. I have about 6 years experience in FEED and EPC roles in the Home Office and in the Field, within Gas, Oil Refining, Petrochemical, Power and Construction industries. I have worked on a variety of projects for clients, including; Woodside Energy (LNG), Petronas (Refinery), Saudi Aramco (Petrochemical), Dow (Petrochemical), NEPA (Power), etc.

For the past 4 years, I have worked as Project Engineer on range of projects; as Assistant Lead Piping Engineer on Petronas PRS2 Revamp Project, Malaysian site office; Piping Proposal Estimator under Piping Corporate Group Management. Also, as part of Foster Wheeler’s structured training program, I worked as a Project Engineer with the Interface Management Team on Ras Tanura Integrated Project (RTIP), which is the largest integrated petrochemical complex ever built at a goal. Currently, due to my performance in Project Engineering discipline, I was transferred to the Utility, Power and Infrastructure (UPI) unit within the RTIP project to assist the Engineering Manager to co-ordinate all engineering activities within the project; Project Change Co-ordinator; Water System Area Project Engineer; Indian Execution Centre (IEC) Project Engineering Co-ordinator; and Project Engineer on Early EPC underground piping system.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 400-Project Management Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.