piping design engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 9 years
Relocation: Yes - Internationally
Industry Experience |
2 years |
|
Engineering |
2 years |
|
|
5 years |
|
|
Career Objective
To achieve a better career
Professional Experience
Experiences with Uhde Engineering Egypt
7-2009 To Now
2010 EFC I&II Revamp basic & detailed design
Activities
Stress analysis of urea reactor and high pressure piping
Preparing pipe routing & Equipment layout using the PDMS system
Preparing steel structure layout using the PDMS system
2010 Abu Quir Waste Heat Boiler Replacement
Activities
Stress analysis for boiler critical lines
Preparing spring hangers and supports specifications
2009 Abu Quir Revamp Basic design
Activities
Preparing pipe routing & Equipment layout using the PDMS system
Preparing steel structure layout using the PDMS system
Preparing piping & steel MTO.
Experiences with S.N.C lavalin Gulf Contractors UAE
10-2008 To 6-2009
2009 Shams Island 01
Piping layout design
Piping stress analysis for cooling water systems
Pipe support design using Caesar II
2009 Sowah Island 01
Piping stress analysis for chilled & cooling water systems
Pipe support design using Caesar II
2008 Reviewing & commenting stress analysis reports for the following projects
Tabreed Cooling Plant T-08
Tabreed Cooling Plant T-07
Experiences with Uhde Engineering Egypt
7-2007 To 9-2008
2008 AQE Revamp study
Activities
Preparing pipe routing & Equipment layout using the PDMS system
Preparing steel structure layout using the PDMS syste
Preparing piping & steel MTO.
Experiences with PETROJET
2-2005 To 6-2007
2007 Lebanon GIA power station storage tanks
Piping Layout Designer
Designing the piping layout for the station using PDMS software
Preparing the required MTO
Selecting the required pumps
2006 Ashrafi-ras el aush 20” pipeline (AGEBA Company)
Detailed Design
Required MTO according to ASME 31.8
Stress analysis of pig launcher & receiver valve room
The project is to transport gas from Ashrafi to Ras el aush
2006 Aqaba 8” pipeline
Detailed Design
Preparing the require MTO
Piping & pipe support according to ASME 31.8
Hydraulic analysis
2006 Rashedia 12” pipeline
Detailed Design
Preparing the require MTO
Piping & pipe support according to ASME 31.8
Eductation
Bsc. of Mech. Power Engineering-2002-Helwan University
Grad. Degree: Good
Project Degree: Excellent
Hot Categories
Chemicals
Batteries