Egypt Zones accountACCOUNT

Process Engineer-Atishay Jain


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
3 years Engineer
0 years
3 years

Career Objective

To pursue a challenging career where creativity is appreciated and, where I will be able to learn continuously and grow consistently adding value to the organization through my capabilities and learning

Professional Experience

Nagarjuna Oil Corporation Limited (A Nagarjuna Group) is setting up a 6 MMTPA oil refinery in Cuddalore, Tamil Nadu.
I had worked in two departments in NOCL:
• Project Department.
• Process Department
In Project Department:
• Preparation of Comparative statements of Pipes, Flanges, Fittings.
• Preparation of Planning Schedule &Monitoring of R0-Ro Ramp Jetty Construction.
• Consistency check PDMS of CDU unit.
• Segregation of Drawing into GAD,PFD,P&ID of woerth refinery database.

SIMULATION:

• Simulation of Crude Distillation unit ,C3/C4 Splitter,FGD scrubber section.
• Sizing and Rating of Heat exchanger.
• Sizing and Rating of Line sizing
• Sizing of pressure vessel.
P&ID REVIEW:
• Review and commented P&ID of following:
1.LPG Merox Unit
2. Jet Fuel Merox unit.
3. Gasoline merox unit.
4. Flue gas Desulphurization unit.
5. Cooling Water system.
6. Compressed Air system.
7. Fire Water system.
8. Nitrogen system.
9. Captive Power & Utility Plant.
DESIGN CALCULATION:
1. RVP Calculation of FCC LPG.
2. Calculation of Nitrogen Balance ,Water Balance .
3. Hold up volume calculation of Fluid Catalytic cracking Unit.
4. Velocity calculation of pipe.
5. Capacity calculation of Amine capacity calculation, SWS capacity calculation.
6. Heat and Mass balance :
a. Fluid Catalytic cracking unit
b. Gasoline Merox unit.
c. Jet Fuel merox unit.
d. LPG Merox unit
e. Flue Gas desulphurization unit.

HAZOP:
• Helped in Hazop close out of following units:
1. Flue gas Desulphurization unit.
2.LPG merox unit
3. Jet Fuel Merox unit.
4. Gasoline Merox unit.
5.Cooling water unit
6.Fire water System
6. Compressed Air system.
Participated in HAZOP MEETING of MEROX UNIT.
Engineering Activity:
• Following Engineering Document Review and Commented : PCFS,Cause and Effect diagram ,Process control operating procedure unit:
1. LPG Merox Unit.
2. Gasoline Merox Unit.
3.Flue Gas desulphurization
4.Jet Fuel Merox unit
• MR Preparation Catalyst of UOP Merox unit.
• Following TBA is reviewed and Commented :
1. Clarrifier of FGD.
2. Belco Scrubber.
3.Flame Arrestor
4.GMU Internals
5. Electrostatic Coalescer Prewash.
SITE ACTIVITY
• Assessment of Equipment (To check life span of equipment).
• Done Reusability Study through which successfully suggested 5 vessel for reuse, through this cost cutting was done

Eductation

B.tech (Applied petroleum Engineering)-2008

Certification

1.Training done in Gas pipe line construction and commissioning in Jay somnath iron works limited .
2.Essar oil refinery in plant training
3.IOCL in plant training

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.