Mechanical/Piping Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Seeking a challenging & growth-oriented profession in mechanical & Piping, where I can utilizes my technical background for the benefit of the Organization.
Professional Experience
1.PM/CTS-Sudapet
WNPOC Field Development & Pipeline Projects-Mech./Piping Engineer(5/6/2011) up to date.
* Review & approve of all conceptual/basic engineering deliverables; technical proposal & all related drawings & Vendor data that suppose to be incorporated with AFC documentation & the requirements of the FAT & reports.
2.PMC-Sudapet
PETROENERGY Phase III Projects-CM/Mech. Engineer (consultant)(3/9/2009)-(10/5/2011).
*Follow & monitor of all related site activities & coordinate between interfaced Contractors, moreover, carried-out all inspections that related to mechanical parts.
* Review & approve of all detailed engineering deliverables; technical proposal & all related drawings & Vendor data that suppose to be incorporated with AFC documentation & requirements of the FAT & reports.
3.HIPSIC
(a)FSF-4 PROJECT-Project Coordinator [(1/4/09)-(3/9/2009).
(b)MOLEETA FPF PROJECT-Project Coordinator [(1/1/08) up to (1/11/2008).
(c)NAEMA PUMP STATION#3 PROJECT-Project Coordinator (15/10/2005)-(15/12/2005).
*Coordinate of all project requirements (requesting, inspection & shifting of material, arranging for reception & transportation of foreigners workmen, following all milestone payments that supposed to be released by Owner, etc).
4.HIPSIC
(a)MOLEETA FPF PROJECT-Mech. Head Section (at site)(2/11/2008)-(15/3/2009).
(b)WNPOC OPERATING BASE CAMP PROJECT-Senior Mech./Piping Engineer(5/9/2006)-(1/2/2007).
(c)MOGA FPF & TRANSIT LINE PROJECT-Senior Mech./Piping Engineer(1/1/2006)-(1/4/2006).
(d)ADAR FPF PROJECT-Piping/Mech. Supervisor(1/2/2005)-(1/10/2005).
(e)DIFFRA FPF PROJECT-Site Engineer(1/1/2004)-(1/12/2004).
* Supervise of all piping & mechanical related activities (fabrication, sandblasting, erection, equipment installation, etc).
5.HIPSIC
BIOREMEDIATION EXPANSION PROJECT (HEGLIEG AREA)-Site Manager (Mech. Side)(1/3/2007)-(15/12/2007).
*Manage of all construction activities & leading site engineers to proceed on their distributed job as per receipted instruction.
6.HIPSIC
PDOC INTERCONNECTION PIPELINE PROJECT-QA/QC Mech. Engineer(10/4/2006)-(10/8/2006).
* Oversee of all subcontractors, site work , conducted tests, deliverables & associated corrective actions; accomplish of all applicable reports; elaborate & coordinate the welding specifications & codes/standards; check all related activities of hydrostatic test, etc.
Eductation
Khartoum University-(Bachelor of Science (honors)-Mechanical Engineer
Additional Information
I would like to pay your attention that I have valid residence certificate at Bahrain Kingdom.
Hot Categories
Chemicals
Batteries