Construction Planner / Work Face Planning Coordinator
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: Yes - Domestically
Career Objective
To acquire a challenging Position in an esteemed organization where I can augment my capabilities and knowledge for the uplift of the organization to achieve personal goals.
Professional Experience
• Tracking of detailed reasons for delays, impacts, and propose solutions, improvements and lessons learnt.
• Responsible for coordinating with department leads to report, provide advice on resource / coactivity conflicts.
• Reporting of physical progress, highlighting trends to management team.
• Carry out analysis of schedule variations
• Collate updates from worksite teams and Site Service Framework contractors
• Carry out resource monitoring and reporting.
• Support the Coordination Team to co-ordinate all activities on site, by preparing relevant schedule reports and advices.
• Maintains, updates, and communicates on short term (3 month) Construction Material Delivery schedule aligned to milestones, in interface with Material management team.
• Maintains, updates, and communicates on Short term (3 month) Construction Site Services Schedule per Scaffolding, Lifting and Handling, Radiological Testing and General Service Framework Contract.
• Constantly analyses and proposes mitigation and recovery solutions to potential disruptions or delays and advises on optimization strategies for resource utilization across the Construction Site Service Contracts.
• As frequently as needed collects and records technical input data, advice, approval on Construction scope and constraints, actual progress and best forecasts from Higher Management.
• Establishes and maintains Construction progress measurement and reporting.
• Updates and feeds back into the weekly progress reports and produces relevant comments and analysis to management through 3 months look ahead.
• Acts in a coordinated way with central planning team members.
• Tracking of actual Construction physical progress,
• Provide useful feedback to Contractors on their Schedule deliverables.
• Coordinating with Worksite teams regarding change control and reporting
• Ensuring material is accurately aligned to the Work Package, such that the right material is available at the right time.
• Assisting with technical queries, construability issues associated work package or installation within the work package.
• Prepare detailed Installation Work Package (IWPs) as per the project guidelines and procedures; which includes, extracting installation drawings, installation details, vendor drawings or any other documents or Engineering deliverables associated with the IWP scope from the project.
Eductation
B.SC MECHANICAL ENGINEERING
Hot Categories
Chemicals
Batteries