Egypt Zones accountACCOUNT

POWER GENERATION OPERATION & MAINTENANCE MANAGEMENT


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
19 years Operations Manager
1 years Mechanical Engineer

Career Objective

I am now seeking the opportunity to join a reputable international company as an O&M Manager or Senior Consultant in Power Generation industry.

Professional Experience

Accomplished power plant and O&M manager with 20+ years of experience:

Dietsmann S.p.A. – Yekaterinburg - Moscow, Russia 2014–present
Maintenance Contractor for Power Plants owned by OGK-5 (Enel-Russia)
Deputy Technical Director - Supervising Maintenance team (~2000) in 4 Thermal Power Plants (~9 GW) and representing Dietsmann for the Maintenance Contract at OGK-5 Technical HO in Yekaterinburg.

Dietsmann S.p.A. – Aksai, West Kazakhstan – 2013–2014
O&M Contractor for Steam & Water Plants owned by KPO (Karachaganak Petroleum Operation)
Plant Superintendent - Managing O&M team (~60) of Steam Generation (4 Macchi Boilers) and Water Plant (RO, Demin. & Condensate Recovery Systems) at KPC (Karachaganak Oil & Gas Process Complex).

ELECTRICITÉ DU LIBAN (EdL) – Beirut, Lebanon– 2011–2013
Company Representative at MEW – for EPC/O&M project of new 400-500 MW CCGT Power Plant
Supervision of the Project: Tender, Bidding process, Clarifications to Bidders, Offers Evaluation, e.t.c. Successful EPC contracting of 565 MW Tri-fuel CCGT Power Plant with 3 GE 9E GTs, 3 HRSGs and a ST at Deir Aamar – Lebanon. Responsible coordinator for the mobilization of the project.

GE ENERGY SERVICES - Sabiya, Kuwait
O&M Contractor for Sabiya 2000 MW CCGT Power Plant.
Operations Manager—Sabiya CCGT Power Plant (2010–2011)
Within limited time frame mobilization and training of the O&M team (~50). Pre-commissioning & Start-up of 9FA GTs and BOP. Exceeded the required 97% Availability of power energy for 2011 summer peak load demand.

ELECTRICITE DU LIBAN (EdL) – Beirut, Lebanon 1996–2010, detailed below:

Power Plant Manager—Deir Aamar CCGT Power Plant (2006–2010)
Deputy Power Plant Manager & Mechanical Department Head—Deir Aamar CCGTPP (1999–2006)
Lead a 130-person team of resources in all aspects of O&M for a 450-MW CCPP consisting of 2 V94.2 GTs, 2 Dual-pressure HRSGs and a ST. Directed the administration of a 5-year, $86M O&M contract. Generate tender documents and oversee parts procurement. Key Achievements:
- Achieved and sustained power plant reliability and availability ratings of 90%+ and efficiency of 48%+.
- Surpassed the performance of identical Zahrani CCPP in Lebanon by 10% and 1%, respectively.

Deputy Power Plant Manager at Deir Aamar CCPP (1999–2006)

Shift Operations Supervisor at 700 MW Zouk Thermal Power Plant (1996–1999)

Eductation

Master of Science in Mechanical Engineering
Aircraft & Aeroengine Maintenance and Gas Turbine O&M Focus
Kiev Institute of Civil Aviation Engineering – Kiev, Ukraine

Master of Science in Economical Engineering
Organization & Planning of Economical Relations and Airlines Management Focus
Kiev Institute of Civil Aviation Engineering – Kiev, Ukraine

Gas Turbine Technology for O&M Engineers Training Certificate
Cranfield University – Cranfield, Bedfordshire, United Kingdom

Master of Science in Engineering Management Coursework
Project Management and Quality Control Focus
University of Balamand – El-Koura, Lebanon

Certification

Selected Professional Development:
PTW Authorized signature ~ H2S ~ Marketing ~ FIDIC Contracts & Arbitration Law ~ HSE Standards & Codes ~ Fundamentals of IPP Structuring & Bidding ~ Gas Contracts Models & Management ~ Environmental Impact Assessment Methodology Training ~ Organizational Structure & Training Methods ~ EU Internal Energy Market Training Program ~ ISO 9001 O&M Compliance ~ Power Plant Maintenance ~ Combined Cycle Power Plant Operations ~ Thermal Power Plant Operations ~ Team Building Program

Additional Information

ADDITIONAL EXPERIENCE:
CONTRACTING & TRADING (C.A.T.) – Abu Dhabi, United Arab Emirates 1996
Site Lead Mechanical Engineer – (UAE Work Permit).
Fabrication and erection of piping and steel structures, as well as installation and commissioning of water pumps for the Bu Hasa Oil Field Water Injection Upgrade Project (3 Water Injection Stations).

DAR AL-HANDASAH (SHAER & CO.) – Beirut, Lebanon 1995–1996
Project Senior Engineer
• Edited and translated technical documentation, proposals, and communications in English and Russian for projects with the Kyrgizstan Telecommunication Network and for the Baku Highway Bypass.

SONABICOM – Tripoli Marine, Lebanon 1994–1995
Facility Lead Mechanical Engineer
• Coordinated a 200-person team in the design and fabrication of steel structures for various applications.
• Created electrical system steel supports, tower structures, and exhaust ducts for electrical companies.

LANGUAGE SKILLS:
- Native Speaker & Translator of Arabic
- Native Speaker, Translator & Instructor of Russian
- Fluent in English with Written Translation Experience

Clean Driving License – Lebanese and Kuwait.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.