Egypt Zones accountACCOUNT

• A Chemical Engineer with 18 years of experience in Air Separation Industry(Cryogenic plants), Utility, Water treatment System, Instrument air syste


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 19 years
Relocation: Yes - Internationally

Industry Experience
19 years Plant Engineer

Career Objective

I am young and self- motivated individual, seeking a challenging position in your esteemed Organization, where I can utilize my skills and knowledge as an employee for growth of the Organization.

Professional Experience

• A Chemical Engineer with 18 years of experience in Air Separation Industry(Cryogenic plants), Utility, Water treatment System, Instrument air system( Utility).
• Currently designated as Shift Incharge (Sr. MANAGER) AT 5100 TPD (03 plants,1700TPD each) OXYGEN PLANTS and utility with INOX AIR PRODUCTS LTD. HAZIRA, SURAT.
• Active participation in COMMISSIONING OF 356 TPD SSAB & 1700 TPD KOBE OXYGEN PLANT at Essar, 1700 TPD AIR PRODUCT PLANT.
• Operates all the plant from DCS from central control room.
Total five plants :

• 1700 TPD two old ASU plant from KOBE STEEL.
• 1700 TPD ASU from AIR PRODUCTS PLANT, UK.
• 356 TPD old ASU purchased from SWEDEN.
• 350 TPD ASU from china .
• 20 M3/hr HYDROEGEN PLANT( water electrolysis system)
• D.M.water plant

Eductation

Diploma in Chemical Engr
. Shri K.J. polytechnic College, Bharuch. T.E.B., Gujarat
1995 69%
S.S.C The progressive High School, Bharuch G.S.E.B, Gujarat 1992 80.4%

Additional Information

• Got first prize in safety competition held in whole Essar steel complex in 2008.

• I had given two successive suggestion to company for modification in plant design
• Utilize plant 2 excess crude argon in plant 1 system and get pure argon production.
 By this modification we produced pure Argon whose market price was Rs. 350 lacs.per year.
 For this suggestion company gave me a SPECIAL AWARD A TROPHY WITH CERTIFICATE AND CASH.
• To bypass chiller by maximum utilizing of Gas Waste Nitrogen in plant 2.
• For this suggestion company gave me a SPECIAL AWARD A CERTIFICATE AND CASH.

• Got award of EMPLOYEE OF THE QUARTER in 2012

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.