senior production engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
- optimization and follow up artificial lift methods (Electrical submersible pump and beamp pumping unit)
- follow up the process plant for crude oil treatment
- follow up the water injection system.
- supervision of wireline operations.
Professional Experience
Field activities:
1-Beam pumping system:
a-Surface unit:
•Complete rig up and rig down for surface unit
•Preventive maintenance for surface unit
•Daily visual check up for beam pumping unit operations
•Beam pumping system optimization
b-Sucker rod string:
•Sucker rod string design (regular and tapered).
•Sucker rod handling.
c-Downhole pump:
•Collection and installation for down hole pump parts.
•Testing the downhole pump before run in hole.
•Troubleshooting all surface and down hole pump problems.
•Supervision of puling unit activities to perform:
-Round trip to change downhole pump.
-Fishing and/or screw-in for sucker rod string.
-Run in hole with anchor downhole pump.
d-Dynamometer:
•Analysis for dynamometer cards.
•Measuring the dynamic/static fluid level by sonic device.
2-Follow up Electrical submersible pump (ESP) installation and operations.
3-Process Plant.
•Follow up crude oil process plant, which consists of (Three-phase separator, Heater treater, Desaltr, Gas scrubber, Water seal and storage tanks).
•Witness of all preventive maintenance for all plant components (vessels, tanks, pumps and all valves.
•Follow all gas and oil calculations.
•Preparation of all daily, monthly, yearly reports.
•All work permit systems (Hot and cold)
4-well test :
Follow up analyzed the data coming from test separator package to determine the well parameter flow rate (oil, water, and gases), pressure, and temp.
5-Water Injection System (The W.I. Plant, Source Wells & Injector Wells):
•Follow up water injection plant.
•Prepare water injection reports.
•Follow up water injection performance through PLT, fall off tests & infectivity tests.
•Conducted stimulation treatments for water injection wells.
•Measure water flow rate (for source/injector wells) by using ultra sonic flowmeter.
6-Have some knowledge about softwares: Eclipse, Petrel & Ecrin.
7-wire line jobs:
Open and close perforation, lowering with memory gauge, isolate some perforation by FWG plug, performed tubing test by fb-2 plug.
Eductation
- master of science in petroleum engineering from politecnico di torino university (italy), october,2010.
- bachlor of science in petroleum engineering suez canal university - faculty of petroleum and mining engineering 2001.
Additional Information
Social skills and competences
- Can deal with other people
- Flexible to meet deadlock.
- Good ability to adapt to multicultural environments, gained through my work experience abroad;
Organisational skills and competences - Self-confidence.
- Good work as a teamwork
- Leadership (currently resposable for a team consist of more than 20 persons)
Technical skills and competences
- Follow up the artificial lift sysytem (beam pumping unit and Electric submersible pump).
- Follow up the crude oil processing plant.
- Follow up the water injection system.
- Have a good knowledge about softwares: Eclipse, Petrel & Ecrin.
- Good user for SAP system
Computer skills and competences
- Very good knowledge of Windows.
- Very good knowledge of Microsoft Office application (Word, Excel and PowerPoint).
- Basic knowledge of graphic design applications (PhotoShop™ and acropat reader).
Artistic skills and competences
- Writing.
- Playing football.
Hot Categories
Chemicals
Batteries