Production operator oil gas
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
Looking for a challenging and interesting opportunity to work as a production operator for a reputed company
Professional Experience
POSITION LOCATION PERIOD
Lead Production operator
Cairn energy India ltd through Brunel India pvt ltd in Rajasthan M.P.T PROJECT
Jan 2010 to till date
Commissioning
Operator Qatar Petroleum Develop ment company(RGX-AKG-2)Through CCIC, QATAR
Jul 2008 to Dec 2009
Commissioning
Operator
SABIC petrochemical Saudi methanol company. Saudi Arabia
Jun 2006 to Feb 2008
Production operator
Gas Processing Complex of Oil India Limited. through S.S.CONSTRUCTION in Mumbai Jun 2004 to may 2006
Eductation
Diploma in Automobile Engineering 2001-2004
S.S.L.C Government high school in Tamilnadu
Certification
Basic Fire Fighting
First Aid Training
Additional Information
Carry out unit field operation s as assigned by control room operator for smooth running of the plant Routine checking of all static and rotary equipment in the unit .If any abnormalities it has to be reported to control room and take the possible corrective action. Monitoring and recording of all process variables in regular intervals Take part in startup and shut down activities. Do the necessary things to carry out hot or cold work inside plant area as per work permit and check all the jobs are doing as per safety procedure.• Watch out for good housekeeping of field area.Involved in the pre commissioning and commissioning activities of various Oil & Gas processing units. This includes Preparation of pre-commissioning and commissioning procedures and its implementation for field activities like hydro testing, line flushing and cleaning – it may be water flushing, air blowing or cardboard blasting, chemical cleaning, oil flushing, steam blowing, pigging etc. depending upon the nature of fluid handing in the system, system dry out, system box up, leak test, chemical filling, inert zing, nitrogen displacement with feed intake etc. Before commissioning of each units other activities like checking of plant for completion as per P&ID – conformity check, preparation of punch list, functional test of rotary equipment, stroke checking of control valves, external and internal inspection of column, vessel etc. also has to be carried out
Hot Categories
Chemicals
Batteries