Instrumentation & control Technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
- Preventive Maintenance Instrument Device of Gas Turbine & Balance of Plant (BOP)
- Corrective Maintenance Instrument Device of Gas Turbine & Balance of Plant (BOP)
- New Installation Instrument Device of Gas Turbine & Balance of Plant (BOP)
Professional Experience
1. Company Name : PT. GRAHA USAHA TEKNIK
Jl. Asem Baris No.100 A Tebet, Jakarta Selatan
Department : Electrical Engineering & Engineering Staff
Date Joined : Oktober 2009 – up to present
Client / Project :
1.
PT.KAI / Double Track Maja
(October 2009 – November 2009)
-
Install, Wiring, Continuity Switchgear 6kV & 20kV
-
Install, Wiring, Continuity Interconnection Panel
-
Drawing Layout Interconnection Panel
-
Addressing PLC
2.
PLTU Asem-asem, South Borneo
(January 2010)
-
Estimate Grounding Length for tender document
-
Estimate Cable Length for tender document
3.
PT. Chevron Indonesia / Ketigul Substation Riau
(February 2010)
-
Lighting Calculation (using Lighting Software) for Ketigul substation
-
Estimate Grounding Length for tender document
-
Estimate Cable Length for tender document
-
Making Cable Schedule Ketigul Substation for tender document
4.
PT. BPAS / Karawang Plant
(February 2010 – March 2010)
-
Estimate Grounding Length for tender document
-
Estimate Cable Length for tender document
-
Making Cable Schedule Karawang Plant for tender document
2. Company Name : PT. SIEMENS INDONESIA (Operation & Maintenance 6 x 143MW GAS TURBINE )
Jl. PLTGU Muara Tawar , Bekasi, West Java, Indonesia
Department : Maintenance Department
Division : Instrumentation & Control Division
Position : Instrumentation & Control Technician
Date Joined : April 2010 – up to present
Scope of Work :
- Preventive Maintenance Instrument Device of Gas Turbine & Balance of Plant (BOP)
- Corrective Maintenance Instrument Device of Gas Turbine & Balance of Plant (BOP)
- New Installation Instrument Device of Gas Turbine & Balance of Plant (BOP)
Eductation
PKKT SIEMENS INDONESIA
Majoring in Mechatronic Engineering
Certification
-
January 2008, Basic PLC S7 Training at PT.SIEMENS AUTOMATION & CONTROL (A&C) Jakarta
-
July 2010, MINIMAX Training (Fire Fighting System & Gas Detector System)
-
January 2011, KONECRANE Training (basic system of crane)
-
February 2011, UNIX FUNDAMENTAL TRAINING (Operation System of UNIX) at IVERSON TECHNOLOGY, Jakarta
-
February 2011, CALIBRATION TRAINING from PT PROXIS Consultant
Hot Categories
Chemicals
Batteries