Well Testing(Lead,Supervisor)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
Reservoir Evaluation Well Testing.
Professional Experience
July 1st 2002- Joined Schlumberger Testing- Well Test Operator-Angola-Working for TOTAL, EXXON in development and explorations oil wells, deep water Angola.
Jan 2003 to Oct 2007-Schlumberger Testing-Angola-Working as Well Test Chief Operator and Well Test Supervisor- Performed Jobs for Total Soyo Land, EXXON, Sonangol P&P for development and Exploration Oil Wells. ESP Well Testing.
- Responsible to follow up all client requirements before and after the job. Equipment preparations at the base, crew selection, perform the job onsite and provide the client with a well testing report, also attached the invoice as per the contracts.
Nov 2007 to Sep 2010- Schlumberger Testing- Algeria- Working as Well Test Supervisor- Main Client was JV Gas, for high rate gas wells(up to 151MMSCF/Day) in Hassi Messaoud desert fields, also involved in jobs for REPSOL, SHELL,PIDC.
-Responsible for running well test simulations at the base(ARCHITEST), maintain contact with the client on a daily basis while following up equipment preparation, running the jobs at well site, providing high quality client data(field) and report(after well Testing), maintenance follow up at the base, invoice client. Member of LPT Team (Lost Prevention Team) in Hassi Messaoud in 2009.
Dec 2010-Jan2011- Worked in Cabinda-Angola on loan for PLUSLPETROL on a Exploration well land job as Well Test Supervisor, Full Package Job, Well: Castanha-4
May 2011 to Sep 2011-Schlumberger Testing-Macaé-Brazil-Well Test Supervisor- Working with Petrobrás and OGX full Package well testing Oil wells with H2S content, development and Exploration wells
- Responsible for equipment selection and preparation from the base until client facility (rig site), making sure the operation is conducted safely and following strictly the programs agreed with client. Provide the client with a daily report (field) and a final report (after well Testing), all operations are conducted under the QHSE policies from SLB and the clients.
Aug 16 2011 to Sep 6 2011 on Loan Trinidad & Tobago
Been overall on Loan on the following Countries: Cameroon, South Africa, Gabon, Trinidad & Tobago and Congo.
OCT 2011- Back to Luanda- Angola.
Eductation
Drilling & Production Specialist
Hot Categories
Chemicals
Batteries