Egypt Zones accountACCOUNT

mechanical inspector/ pipe line inspector


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
15 years Construction Technician
4 years
5 years

Career Objective

• Job Roles: -Mechanical Inspector, NDT Technician, -Industrial Radiographer (RT II), -Dye penetration inspection (DP), -Magnetic particle inspection (MPI), -Instrumentation and automation and control.

Professional Experience

PROFESSIONAL PROFILE
Welding /Piping /Mechanical Inspector, a competent professional with over 20 years of work experience in Welding, NDT, Piping and Inspection& instrumentation. Demonstrated skills in inspection activities. Ensuring compliance to quality standards and maintaining all related documents. Distinction of handling in various projects like Construction of Gas and Oil Separation Plant; handled Pressure Vessels, Storage tanks & Cross Country Pipelines with clients like Agip (Abu Tafil) 30’’ pipe and Veba oil field(Amal, juffra, Ghani, Tibisti Field) & Pakistan. Proficient in undertaking QC activities related to Fabrication/ Erection/ Welding of Piping, Pipelines, Pressure Vessels in accordance with ASME B31.3, B31.4, B31.8, ASME sec VIII and Project specification.


PROFESSIONAL EXPERIENCE

Yr (2007 – To Date):
Company name: OPS International
Client: AL HAROUJE OIL OPERATIONS
Position: Mechanical Inspector

Duties & Responsibilities

• Inspection of all welding works in the project covering pressure piping in accordance with approved WPS/PQR and application Industry code practice ie., ASME sec IX, II, ANSI B31.3,API 1104
• Responsibilities also include preparation of inspection test plan, PQR/WQT/ QC documents and test packages.
• To Witness the hydro test and pneumatic test of various wellheads, flow lines and trunk lines
• To witness and inspect hot tapping welds of existing gas flow pipelines.
• To analyze the weld repairs and take corrective and preventive actions.
• To witness pigging and gauging of trunk lines and flow lines.
• To check Installation of gaskets and stud bolt tightening.

Yr (1995 – 2003):

Company name: AOT (Austrian Oil Technology)
Position: NDT Technician (RT II)

Duties & Responsibilities

• VEBA (veba oil operations): Main assignment was radiography and interpretation of defects in tanks, on different size of pipelines (from ½” to 36inches) vessels in different in oil fields in Libya. (six years in Veba oil Operation s on different fields like Amal JuFfra,Ghani,Tibisti and Raslanuf)
• AGIP oil and gas with Bonatti on NGL plant
• Misurata steel complex one year with Danali on gas plant erectio.100% radiography with Xray machine and 100% Dye penetration


Eductation

QUALIFICATION
• Secondary school certificate (Science group)
• FSC intermediate
• BA

Certification

TECHNICAL TRAINING
• Diploma in mechanical engineering from Govt. College of Technology S.I.T.E Karachi
• 2 years training in Instrumentation Automation and control in Pakistan Steel Mill Karachi.
• 1 month training from pet roman in advance Industrial Electronic.
• 3 months abroad training for the installation & commissioning of continuous casting plant.
• Radiographer level II from HMC Taxila & Pakistan atomic Energy commission.
• 2 weeks course for the interpretation of radiographs at Pakistan Atomic Energy Commission Islamabad.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Contracting Services » News » Dredging » News » Electrical » News » Mechanical » News » Pipe Lines Installations » News » Steel Works » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.