Electrical Engineer (Gas Processing plant)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
Motivated Electrical Engineer specialized in Electric Power, Machines.3-Years work experience in gas field (Gas processing plant).
Capable of working with others in a multi-cultural environment.
Ready to enrich my knowledge and work related skills.
Professional Experience
Egyptian Natural Gas Company GASCO ,
Western Desert Gas Complex, Alexandria - Egypt March 2009 till Present
The complex is the first NGL plant in Egypt producing the ethane propane mixture for petrochemical industry. The plant receives & treats 900 MMSCFD of western desert gases to produce Ethane/Propane mixture, commercial propane, LPG and Condensate.
o Electrical Maintenance and Substation Operation Engineer
- EATON HOLEC 11KV, 6.6 KV, 400 V Switch Gear Operation & Maintenance.
- GE Multilin digital Protection relays.
- LV & MV motors O&M.
- BENNING UPS (2x60 KVA) and BENNING battery chargers O&M.
- Earthing, Lightning protection systems & cathodic protection.
- Perform 5 years maintenance of MV vacuum C.Bs & MV switchgear.
- Prepare the annual maintenance plan for plant electrical equipment.
- Prepare Annual materials requisitions.
- MAXIMO Computerized Maintenance Management software.
- Basic knowledge of HVAC systems ( Chiller water , DX units).
o Commissioning & Start up of “MAXIMIZATION of C2/C3 from WDGF” project.
- EATON 11 KV, 400V SWG.
- Convel & AEG UPS.
- Interconnections between Electrical S/S and control room.
- Prosernat/Manturbo Refrigeration package compressors ( 3x 5MW,11KV
motors).
- Starting 5 MW motor using Siemens Perfect Harmony VFD.
o Commissioning & Start up of “New Feed” project.
- Siemens SGT-600 Turbine & Kraftelektronik UMD system.
- Extension of EATON LV SWG.
- Modification of SCADA system communication from Modbus to Ethernet.
o Health, Safety and Environmental
- Work Permits and electrical isolation certificates (lock-out tag-out
system).
- Emergency Plans, Fire Fighting, Electrical Safety trainings.
o Participate in 3 Total Shutdown activities
- Extension of LV Switchgear.
- UPS Shutdown to install new Distribution Panel.
- MV & LV Switchgear maintenance.
o Technical Reports
- Effect of Earth leakage currents in UPS loads.
- Successive starting of Air Compressor motors.
- Improve lighting system of Main S/S (Design using Dialux software).
Encon Integrated Solutions September 2008
o Siemens system integrator ( PLC & SCADA ).
Eductation
Faculty of Engineering , Alexandria University
Bsc, Electrical Engineering 2008, Electric Power & Machines section
Over-All Grade : Very Good
Graduation Project : Analysis and design of an Industrial Power System,
Grade : Excellent
Alexandria Language School (ALS)
Certification
First Aid basics July 2011
Basics of PLC & DSC systems , OGS June 2010
Preparation for Professional engineer licensure,NCEES organization April 2009
o Pass FE exam held at the American University in Cairo
PLC Siemens S7-300 Simatic Manager & WinCC software 2008
German Language Course in Goethe-Institute ( 6 Levels ) September 2007
Human Development lectures prepared by Skills Institution:
• Presentation skills -Time Management - Self Learning.
Hot Categories
Chemicals
Batteries