Painting Inspector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 11 years
Relocation: Yes - Internationally
Career Objective
To work with growing organisation in leading position where I can utilize my knowlwdge,skill,innovation and commitment in painting,FBE/PE/PP coating,insulation,galvanising and Rubber lining field.
Professional Experience
EMPLOYMENT DETAIL:-
8th-COMPANY: OLAYAN DESCON Engineering/Industrial Co.
LOCATION: Kingdom of Saudi Arabia.
DESIGNATION: QA/QC Inspector (Material & Coating)
PERIOD: June 10, 2008 to Oct. 07, 2011.
7th-COMPANY: Consolidated Contracting Company (CCC)
LOCATION: Al-Jubail Kingdom of Saudi Arabia
PROJECT: Khursaniyah Producing Facilities (KPF).
DESIGNATION: Pipe Fabricator / Painting Inspector
PERIOD: May 20, 2006 ¡V Dec.07, 2007.
6th-COMPANY: Fauji Fertilizer Co. (FFC-3)
LOCATION: Mir Pur Mathelo Pakistan.
DESIGNATION: Mechanical Technician
PERIOD: April 13, 2004 ¡V May 16, 2006.
5th-COMPANY: Engro Chemicals Dharki (Shut Down).
LOCATION: Dharki Distt. Ghotki, Pakistan.
DESIGNATION: Pipe Fabricator
PERIOD: March 31, 2004 ¡V April 11, 2004.
4th-COMPANY: Fauji Fertilizer Co. (FFC-2).
LOCATION: Machhi Goth Sadiqabad, Pakistan.
DESIGNATION: Pipe Fabricator
PERIOD: July 23, 2003 ¡V March 18, 2004.
3rd-COMPANY: Haris & Co.
PROJECT: Pak Arab Oil Refinery (PARCO)
LOCATION: Qasba Gujrat, Pakistan.
DESIGNATION: Pipe Fitter
PERIOD: Jan.10, 1999 ¡V Nov.20, 1999.
2nd-COMPANY: Jaguar Technical Services Company.
PROJECT: Engro Chemicals Dharki
LOCATION: Dharki, Pakistan.
DESIGNATION: Pipe Fitter
PERIOD: July 10, 1998 ¡V Dec.28, 1998.
1st-COMPANY: Haris & Co.
PROJECT: Uch Thermal Power Station
LOCATION: Dera Murad Jamali, Pakistan.
DESIGNATION: Pipe Fitter
PERIOD: Jan.01, 1998 ¡V June 31, 1998.
Eductation
ACADEMIC QUALIFICATION:-
„« S.S.C. in 1995 from Secondary Board of Education Bahawalpur, Pakistan.
„« DAE (Mechanical) in 2003 from Punjab Board of Technical Education Lahore, Pakistan.
„« Bachelor of Arts in 2005 from Islamia University Bahawalpur, Pakistan.
Certification
PROFESSIONAL CERTIFICATION:-
„« BGas-CSWIP Gr.2 PAINTING INSPECTOR (CERT. NO BG610277).
„« NDT ASNT Level-II in PT, MT & RT. as per SNT-TC-1A-2006 Ed.
Additional Information
RESPONSIBILITIES:-
„« To study the subject project approved ITP and prepare inspection schedule.
„« Receive Internal RFI along with necessary documents / drawings from Project Execution, Internal Inspection as per project specifications. If any deviation found, internal punch lists are raised.
„« After internal verification, raise external RFI with inspection report to client representative.
„« „« „« Conduct Salt Test (Chloride Test).
„« Check Paint Specification as per Procedure / Client Specification / Manufacturer Date Sheet.
„« Physically check the paint date of expiry & RAL # (Colour Code).
„« Monitor Paint Mixing Ratio.
„« After mixing check paint pot life.
„« Check paint application method.
„« Keep record of Wet film thickness (WFT) & Dry film thickness (DFT).
„« Note down the paint film dry to touch time and re-coat interval time.
„« Visual Inspection of the job.
„« Conduct adhesion test.
„« Final inspection of paint defects and inform painting supervisor to rectify.
„« Arrange Holiday detection of the paint. Mark the missing areas repair / touch up.
„« Final measurement of DFT and check the job thoroughly.
„« Keep calibration record of all quality control material.
„« Prepare Blasting & Painting reports.
„« Inspection of Plant Piping, Pressure Vessels, Tanks, Heat Exchanger, Columns, etc.
„« Coordination with Client QC Inspector for the final inspection and to sign the reports.
Hot Categories
Chemicals
Batteries