junior reservoir engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 0 years
Relocation: Yes - Internationally
Career Objective
recently graduated as a reservoir engineer from the ifp school, I am looking forward to starting my career within an oil company to put in practice my know-how and to enhance it aiming to build a strong career in reservoir engineering.
Professional Experience
*internships
july-December 2011 total, france
- task: characterization of horizontal well fractures producing from gas shale reservoir through well test interpretation and simulation
- key words: gas shale, multi-porosity, fractuared reservoir,
- software utilized: eclipse 300, pie, ecrin (saphir+topaze)
february-june 2010 graduation project at chloe, france
- task: application of diffuse interface method for micro-scale modeling of two-phase immiscible flow
- key words: navier-stokes equations, cahn-hilliard equations, comsol software
August 2009 schlumberger, tunisia
- task: designing a swiveling crane to be installed in the drill stem testing workshop in the well testing base of sclumberger tunisia
- key words: crane, rolling bridge, cm66, sap2000
July 2009 british gas, tunisia
- task: production decline analysis in the Miskar field and prediction of the future daily production rate.
- key words: Decline curves analysis, Arps method
*projects done within the ifp school
project 1: calculating the original oil in place (ooip) of a field after determining its parameters through pvt data and log analysis.
project 2: building a development project with production profile over fifteen years using software: pvt package, pie, crystal ball, mbale, eclipse.
project 3: well drilling and completion studies
project 4: development of a gas field located in Iran (from ogip estimation to surface installation design)
Eductation
sep 2010 – july 2011 msc in petroleum engineering–ifp school
teaching units
general geology, geophysics, petrophysics, logging, PVT analysis
well test, reserves evaluation and production scheme setting natural drainage, second and tertiary recovery, fractured reservoirs, EOR, horizontal wells
well architecture and preparation; wells realization and drilling control; well productivity; principles and processing units of crude oil and gas; effluent treatment: equipment, flows, instrumentation reliability; offshore installation.
Sep. 2007 – June 2010 tunisia polytechnic school
1st school in the ranking of engineering schools in tunisia;
good training in fundamental sciences, applied mathematics, computer sciences,
economics and management.
Specialized courses: fluid mechanics, petroleum industry, geology and geophysics, soil mechanics, heat transfer, thermal machine, continuum mechanics, limit analysis...
Certification
november 2009 total-tpa
- one week training in reservoir engineering and geosciences given by dr. khaled madamoui (tpa-total)
Hot Categories
Chemicals
Batteries