To accept challenging position in organization and grow on the basis of personal abilities and to provide effective and efficient services to the best of my knowledge to an organization.
Professional Experience
1.MOL PAKISTAN OIL & GAS CO.B.V
Associated with the company as Production Operator from July 2010 to date. Operating System, DCS Yokogawa centum 3000
Communication of Well instrumentation through SCADA
Gathering Manifold / Valve Assemblies with Pig Stations
Three Phase Separator (Slug Catcher)
Inlet Separation System,
Corrosion Inhibitor Injection Package,
BTEX Unit, incinerator.
HCDP (Hydrocarbon Dew point Control Unit) with JT Valve
Sale Gas & Flash Gas Booster PD Compressor Unit
Condensate Stabilization Unit
Mercury Remover Unit
TEG based Glycol Dehydration Unit,
Sales Gas Metering.
2.Engro Polymer & Chemical
Associated with the company as Area Assistant Engr. from December 2008 to July 2010. On EDC VCM plant, (Cracking of EDC).
Ethylene Di Chloride (EDC) and Vinyle Chloride Monomer (VCM) is 1st largest Petrochemical Complex in Pakistan. I join EPCL in commissioning phase, I got exposed to various tools/techniques & procedures for effective commissioning.
Responsibilities during commissioning
Follow standard safety procedure work order and work permit policies
Punch listing, Hydro test pressure, flushing, blowing, leak test, O2 free etc
Refractory dry out of the horizontal furnace and its pre start up, start up and its normal shutdown.
Dry out the HCL, VCL, HED,VACUME, LIGHT columns And quench tower from moisture & its star up
Startup of the fourth stage centrifugal compressor
Loading the catalyst copper chloride on oxy reactor & ferric chloride loaded on direct chlorination reactor.
3.Attock Refinery Limited Rawalpindi.
Associated with the company as Field Operator from July 2005 to December 2008.
Plate forming (Reformer) Unit. Designed by Mitsui Engineering Company on the Technology of Union of Petroleum (UOP), USA.
The unit having capacity of 5000 barrels/day is able to get 90 RONC PMG.
Distributed Control System of HONEYWELL operates the unit.
Platinum and Rhenium catalyst (R-56) is used in Reformer reactor.
Cobalt Molybdenum catalyst (S-12) is used in Hydro reactor.
Compressor “single stage double acting reciprocating”
Furnace “vertical cylindrical natural draft”
Eductation
B-Tech Pass (CHEMICAL), with 3.15 CGPA from Indus Institute of Higher Education Karachi Pakistan.
Certification
DuPont Safety system PSRM Skill certified from EPCL.
ERP Skill Certified from EPCL.
Fire Fighting Training from HSE department.
Six Months Computer Software Course.
Work Permit System.
Additional Information
PERSONAL INFORMATION
Father’s Name Muhammad Yousaf
Date of Birth 11th March 1985
CNIC # 17301-1324737-1
Domicile Charsadda KPK
Marital Status Single
Nationality Pakistani
Passport No RP 4107371
Hot Categories
Chemicals
Batteries