Egypt Zones accountACCOUNT

Mechanical field engineer(well stimulation)


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
3 years Field Engineer

Career Objective

To work in a demanding environment and develop a professional career in the long term in an atmosphere which encourages good human relations as to enable both personal and professional growth in order to achieve excellence.

Professional Experience

Working experience:
• Make a P.T.O (power take off) unit for frack pumper. With the help of wane pump, crate a pressure till 2000 psi and transmit to the hydraulic starter through solenoid valve for actuation.

• Hydraulic fracturing job:
Hydraulic fracturing job has been done in 3440 meter depth of the well with very low permeability well(<0.01MD) with 8500 psi closer pressure and 30 bbl/min injection rate. total job size was 40 tone 20-40 sand uses. with the help of Mechanical packer with tubing. and the result was successes.


• Sand jet operation:
With the help of CTU, sand jet perforation at 3139 meter depth at sand stone formation, working pressure 7000psi and 4.2 bbl/mim flow rate with 2.2 ppg sand. the size of the nozzle of the perforation gun is 1/8”.the coil size OD of CTU was 1.75”

• Acid job:
Acid job has been done in low permeability well, with mechanical packer.
30% concentrated HCL, with frack pumps. the flow rate was 1.4bbl/mim and the working pressure was 5500 psi. after this fracturing job done with working pressure 8300 psi and inject flow rate at 27 bbl/min.20-40 size propant has been used .the job size was 35 tone.

• Well killing operation:
The flowing pressure of the well was 900 psi at 1/4” choke size. with the use of 1.16 specific gravity brine(KCL water) and pumping pressure was 6500 psi and the max. flow rate was 2.5bbl/min.
• Commissioning operation:
Engaged in coordinating and supporting Stewart & Stevenson engineers at the time of commissioning of WSS Fleet of 21 units at FOCUS ENERGY LTD, Rajasthan Jaisalmer.(Unit comprises of 12 Triplex Frack pumpers and 6 Quintriplex Frack pumpers, working pressure-15000psi and plunger size-4”,Blender unit-Coil tubing unit, hydration unit, and Data Van).

Eductation

Name of Examination School / College University/Board Percentage
(Aggregate) Year of passing
B-Tech. (MECHANICAL) IIMT Engineering College Meerut. UPTU 66.40% 2009
Intermediate Saraswati Vidya Mandir Inter College VIP road fatehpur UP BOARD 65 .00% 2003
High school Sarvodya inter college kishanpur UP BOARD 66.00% 2001

Certification

Certified by Stewart & Stevenson for Commissioning of Equipment’s like Frac Pump, Coil Tubing, Blender, and Chemical Additive System.
Summer training on “DESIGN ON GUIDE BUND FOR PROPOSED ON THE RIVER KAMLA BALAN, DARBHANGA”from IIT KANPUR.
Data acquisition (Accufrac) Auto Cadd, MS Office, MS Windows and Internet

Additional Information

Feather’s Name : Mr. Jitendra Singh
Date of Birth : 13 September 1987
Hobbies : Bike riding, playing Cricket and computer games.
Marital Status : Single
Contact Address : Behind SP residence shakun nagar colony, civil line, fatehpur
Sex : Male
Nationality : Indian
Passport No : J4148238
Date of expiry : 28-11-2020
Place of issue : Lucknow
Linguistic Skills : English, Hindi (Read and Write)

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.